4027 search results for "zero lot line"
Topic | Recent |
---|---|
Densely occupied spaces exemptionEBOM-2009 IEQc1.2: Indoor air quality best management practices - outdoor air delivery monitoringposted by Katherine Ann Resurreccion on Oct 9, 2012, 6:22 amHi All, We have a project that has a lot of meeting rooms (area of each room is smaller than 150 square feet) that can accomodate 4 person per meeting room- therefore considered densely occupied and should be provided with CO2 sensors. However, the reference guide states that individual rooms smaller than 150 square feet are exempted. Which will govern? IEQc1.2 ... Last reply: Hannah Bronfman, Oct 19, 2012, 3:58 pm |
|
How many times can the appeal be submitted?LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by dia2000@gmail.com dia2000@gmail.com on Oct 10, 2012, 7:32 amcredit and used Zero water, that was not enough. It was also not enough to provide the original planning and programming documentation showing that a steamer was indeed the school desire from the start... Last reply: Hernando Miranda, Oct 10, 2012, 10:55 am |
|
Compliance?CI-2009 EAp2: Minimum Energy Performanceposted by Alex AC on Oct 12, 2012, 1:48 pmthe simulation. (not even on lists.onebuilding.org). So, I wonder if anyone knows of any sort of on-line lectures that deal exclusively with this kind of simulation. Log in or register to post comments Marcus... Last reply: Marcus Sheffer, Oct 18, 2012, 5:11 pm |
|
RelocationNC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roofposted by Kath Williams on Oct 16, 2012, 5:02 pmbut clearly at some point it will cross a line into material reuse. Log in or register to post comments ... Last reply: Tristan Roberts, Oct 17, 2012, 10:13 am |
|
international project outside USEBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by Sofia Otterheim on Oct 19, 2012, 10:17 amportfolio for a rating in line with case 1 no matter where the building is located as long as the building is comprised of ratable spaces.? I really appreciate if some of you can answer my question!!!!! EAc1 ... Last reply: Marcus Sheffer, Oct 22, 2012, 10:38 am |
|
PSZ-HP system and preheat coilsNC-2009 EAc1: Optimize Energy Performanceposted by Francesco Passerini on Oct 22, 2012, 12:42 pmIn the proposed design an AHU is connected to a lot of zones. In that AHU there is a preheat coil. I have to model the baseline model as system 4 PSZ-HP. In order to meet the setpoint temperatures I think that I cannot create a PSZ-HP that is connected to so many zones, i.e. I have to create more than one PSZ-HP system. According to G3.1.2.3 “If the HVAC system in the proposed design has a preheat coil and a preheat coil can be modeled in the baseline, the baseline system shall be modeled with a preheat coil controlled in the same manner”. If I create many PSZ-HP systems in the baseline model,... Last reply: Marcus Sheffer, Oct 24, 2012, 12:16 pm |
|
Interior Renovations and Non-Contiguous Parcels as Part of LPBHealthcare-v2009 MPR3: Must use a reasonable site boundaryposted by Brooks Critchfield on Oct 22, 2012, 2:43 pmof Representatives LEEDuser Expert 11477 thumbs up October 24, 2012- 2:12 pm For your reference, LEEDuser has the MPR Supplemental Guidance posted for each MPR, above on our Bird's Eye View tabs. A lot easier... Last reply: Tristan Roberts, Oct 24, 2012, 2:12 pm |
|
Recycled Content of Steel from Multiple SuppliersNC-2009 MRc4: Recycled Contentposted by Jerry Reeves on Oct 24, 2012, 11:25 amrecycled content for all products and revise the form as necessary. Regarding Note 1: I placed Bull Moose Tubing &Steel Dynamics product on 2 separate lines on the credit form. Are telling me I have... Last reply: Hernando Miranda, Oct 24, 2012, 1:21 pm |
|
FSC assembly requirement for LEEDNC-2009 MRc7: Certified Woodposted by Paul Setzer on Oct 26, 2012, 3:55 pmThis combination of circumstances is a calculation and documentation nightmare that too many woodworkers and project teams have struggle with. As is apparent elsewhere in this forum, there is a lot of confusion... Last reply: Jason Grant, Dec 11, 2012, 1:09 pm |
|
Calculating Daylight via the Prescriptive MethodNC-2009 IEQc8.1: Daylight and views - daylightposted by Dan Bielenin on Nov 5, 2012, 11:14 amEddy Santosa Director of Sustainability DBR Engineering Consultants LEEDuser Basic Member 376 thumbs up November 5, 2012- 12:03 pm Dan, I suggest you use the simulation to design the daylight. Typically, housing complex has modular design so it will be faster and easier to use simulation or daylight measurement. It give you a lot of advantages to have a better design and high performance building by incorporating daylight into design by using a simulation. If your goal is only to achieve LEED point which I don't recommend actually, you may reduce your VLT of your glass to lower the number... Last reply: Eddy Santosa, Nov 5, 2012, 12:26 pm |