NC-v4.1 MRc5: Construction and demolition waste management
posted by Jonathan Weiss on Nov 24, 2020, 3:41 pm

I am hoping I read this wrong, but the current version of the credit on USGBC.org and the Addendum posting (as of early November) seems to have changed this credit significantly - Option 1 is 1...

Last reply: Chloe Bendistis, Sep 1, 2021, 12:53 pm

RCI Visual Inspections- STILL???

NC-v4.1 MRc5: Construction and demolition waste management
posted by Kimberlee Ilardi on Oct 7, 2019, 3:04 pm

Tiffany Beffel Managing Partner Innovative Workshop Consulting LEEDuser Expert 22 thumbs up October 21, 2019- 6:20 am Hi Kimberlee!  This is a hot topic for sure and I want to direct you to MRc2, where there was some key discussion with regard to visual inspections:  https://leeduser.buildinggreen.com/forum/alternative-calculation-mrc2.  You are correct, commingled is considered single-stream, whether it is project specific or the facility average.  And, it still remains true that visual inspection is not an acceptable method of evaluation. I am curious how their visual inspection effects...

Last reply: Tiffany Beffel, Nov 15, 2019, 2:56 pm

Previous Buildings Demolition activities

NC-v4.1 MRc5: Construction and demolition waste management
posted by Carla Joan Carrasquillo on Jun 23, 2023, 9:55 am

I'm working with a project that comprehends various buildings (~20), from which only 10 will be certified. The complexity of the project is related to the demolition activities that will take...

Last reply: Dave Hubka, Apr 22, 2024, 3:28 pm

Opt 2. Waste Prevention

NC-v4.1 MRc5: Construction and demolition waste management
posted by Dave Hubka on Apr 5, 2022, 11:41 am

If a project pursues Option 2 - Waste Prevention is it required to track disposal and diversion rates of the project?

odd that...

Last reply: Dave Hubka, Nov 13, 2024, 7:28 am

Exemplary Performance

NC-v4.1 MRc5: Construction and demolition waste management
posted by Maria Porter on Oct 8, 2020, 5:44 am

EP seems to be removed in v4.1, correct? In v4 it was take both option 1 and 2.

Last reply: Maria Porter, Oct 8, 2020, 8:17 am

Commingled waste and numbers of waste streams

NC-v4.1 MRc5: Construction and demolition waste management
posted by Bryna Dunn on Apr 9, 2020, 4:59 pm

Is there a documented environmental benefit to all the extra red tape we have to wade through "for LEED points" for projects where collecting in a commingled bin is actually the most likely way...

Last reply: Tiffany Beffel, May 31, 2020, 2:00 pm

Option 2- Reduction of Total Waste Material for major renovation project

NC-v4.1 MRc5: Construction and demolition waste management
posted by Adam Yarnell on May 6, 2020, 3:51 pm

Hi,

What is everyone's take on pursuing Option 2 for a major renovation project? A hopeful approach is to target a 75% diversion for the demo and...

Last reply: Tiffany Beffel, May 31, 2020, 2:32 pm

ID# 100002448

NC-v4.1 MRc5: Construction and demolition waste management
posted by Esther Leung on Nov 30, 2020, 8:35 am

Under the latest Addenda issued November 9, 2020 (https://www.usgbc.org/leedaddenda/100002448), do you agree that the requirements on ...

Last reply: Sarah Buffaloe, May 19, 2021, 9:19 am

ADC- Alternative Daily Cover

NC-v4.1 MRc5: Construction and demolition waste management
posted by Catherine Blakemore on Feb 2, 2023, 9:25 am

Does ADC have to be included in the overall waste total for Option 2 or is it just factor into the overall total for Option 1 only?

  -If Option 2 is selection on the LEED Online form the...

Last reply: Dave Hubka, Feb 2, 2023, 9:28 am

"cold in-place recycling" aka "asphalt milling" aka "cold regeneration"

NC-v4.1 MRc5: Construction and demolition waste management
posted by Joyce Kelly on Jul 10, 2024, 2:28 pm

This could support this credit and possibly others in the MR and SS categories. Has anyone pursued this within a LEED project?
Our Civil Engineer describes it this way:  "There is a process...

Last reply: Dave Hubka, Jul 10, 2024, 2:52 pm