Log in
Forum » Latin America and the Caribbean
Loading...
Topic

Enhanced IAQ Strategies, applicable Entries Querie.

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by Angel Giovani Bernal on Sep 19, 2019, 1:58 pm

Hi everybody.

I'm working on a commercial interiors project located on the 9th, 12th, 14th & 15th floor.

I'm trying to identify the regularly used exterior entrances to the...

Robot parking

CS-v4 INc1: Innovation
posted by gabriel Morales on Sep 13, 2019, 12:31 pm

Hello,

We have a project in the city of Mexico, the parking is underground with a very special feature, it is robotic, the user will place it in the basement 1 on a platform and from there...

Multi Scene Control for Lighting

NC-v4 EAp2: Minimum Energy Performance
posted by Gabriela Crespo on Apr 18, 2016, 2:29 pm

Dear all,

We're working on a LEED v4 NC project in Mexico.
I am referring to Exceptions to 9.4.1.2b of standard ASHRAE 90.1-2010, where the automatic lighting shutoff control can be...

Last reply: Marcus Sheffer, Sep 3, 2019, 2:21 pm

Zero Lot Line Deveoped Site

CS-2009 SSc6.1: Stormwater design - quantity control
posted by Guillermo Hernandez Espinoza on Jul 8, 2019, 5:54 pm

Hi everyone.

We are working on a zero lot line site where an old building was demolished in order to start with the new one.
The old building was composed only by hardscapes.
...

Last reply: Guillermo Hernandez Espinoza, Aug 22, 2019, 4:12 pm

Documenting the various Water Efficiency Credits

CS-2009 WEc2: Innovative Wastewater Technologies
posted by Guillermo Hernandez Espinoza on Aug 2, 2019, 2:09 pm

Hi everyone.

I'm a bit confused about how to document the different credits, due to the way I should fill the forms.

In summary, we achieve a 32% reduction on potable water use by...

Prerequisites Submitted under Campus

LEED Rating System Selection
posted by Guillermo Hernandez Espinoza on Jul 2, 2019, 3:56 pm

Hi everyone, I was wondering, since some of the prerequisites are Campus Eligible, does that means I don't have to submitted those prerequisites if earned for the LEED projects inside the campus...

Last reply: Bipin Karki, Jul 17, 2019, 3:53 pm

Entryway system extends into elevator

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Angela Barreto on Jul 12, 2019, 5:25 pm

Hi,

we have a project with a complying entryway system at ground level. However, the LEED reviewer has pointed out an entryway system is also required at the elevator lobby in our...

Exhaust not interlocked with HVAC

NC-2009 EAp2: Minimum Energy Performance
posted by Jorge López de Obeso on Nov 14, 2018, 11:38 am

Hello, we have this residential project were the HVAC system is as follows:

Baseline: System 2 - PTHP

Proposed: Mini Split System

The thing here is that, as known,...

Last reply: deuisi cromversa, Jul 10, 2019, 4:43 pm

Recommendation for simple equipment purchased online for CO2 and TVOC measurement?

EBOM-v4.1 EQc1: Indoor Environmental Quality Performance
posted by CBRE Sustainable Building Advisory on Jul 4, 2019, 5:00 pm

Could there be any recommendation of simple equipment purchased online for the measurement of CO2 and...

Zero lot line projects

NC-v4 SSc4: Rainwater management
posted by Gustavo De las Heras Izquierdo on Mar 26, 2015, 12:47 pm

Path 3 states: "manage on site the runoff from the developed site for the 85th percentile ". I guess this requirement was made to exclude the sidewalk from calculations. Am I reading this...

Last reply: David Hubka, Jun 20, 2019, 7:52 pm