Our CI project is a 4-floor office space located in a 10-floor commercial building. We used the split-review option and are currently working with the Final Design Appeal. Recently, the owner decided to rent a portion of the 5th floor and wishes to include them in the LEED certification. The 5th floor is currently under construction simultaneous with the 1st-4th floors.
From the CI Reference guide, it stated that "if the project team has had a design phase review and any of the anticipated credits have since changed, additional documentation must be submitted to substantiate continued compliance with the credit requirements"
Because of the increase in GFA, majority of the design credits will be changed. Does this mean we can make the revisions/ additions for the 5th floor in the Construction phase? Would greatly appreciate your thoughts.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.