Is it acceptable to submit design prerequisite credits during the construction review phase?
Based on all the information that I have read, this is acceptable to add in new design credits during the construction review, but want to be sure that there isn't any caveat when it comes to the prerequisite credits.
We have already submitted for our preliminary design review. We did not include documentation for the EQ P.2 as we expected to provide photographic documentation of a no smoking sign that will be installed.
However, I am starting to question my decision of deferring this credit submission to construction and wish to confirm that this is acceptable to wait.
Thanks
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.