Forum quick links
BOOKS! Green Gurus' Goodreads Group
posted by GBD Architects on
Love books? Want some inspiration? Join this Goodreads group with the following link...
LEED CS 2009 SSc4.3 - Option 1 Preferred Parking
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Nicole Isk on
Dear all,
no water meter
posted by Tristan Roberts on
Like a lot of buildings with their own well, my project has no water meter. I assume that means no points for Water Performance in recertification, but is it a prerequisite? Any tips? Thanks.
air renewal in 72 000cubic meters warehouse
Warehouses-NC-v4 EQp1:Minimum indoor air quality performanceposted by Thibaut REMY on
Hello,
I am looking for help with an issue concerning the ventilation requirement EQP1 for a logistic warehouse.
Refurbishing patio furniture
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Bo White on
The owner has been considering to replace their patio furniture because it looks weathered. They have been researching qualifying furniture but aren't happy with the look.
BPDO EPDs for typically excluded Masterspec divisions (MEP), without adding to costs for BPDO Sourcing of Raw Material?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Renee Shirey on
Can I gather EPDs for MEP equipment, and NOT be required to include the cost of those products in the calculations for Sourcing of Raw Materials? The Reference Book is clear that "the de
VRP Calculations - compliant or not
NC-v4 EQp1:Minimum indoor air quality performanceposted by susan eguia on
Hi,
We completed the VRP calculations and the summary tab under "Outdoor air intake flow provided meets or exceeds Vot?", it says Yes or No for each system.
Modeled Ventilation Rate with EQpc124
NC-v4 EAp2:Minimum energy performanceposted by Stephen Lyons on
We're evaluating LEED pilot credit EQpc124 which provides an alternative approach to several indoor air quality credits while meeting the minimum IAQ performance prerequisite.
LEED Boundary vs. Property Line vs. Limit of Disturbance
NC-v4 MPR2:Must use reasonable LEED boundariesposted by H Leinbach on
I'm not sure where to establish the LEED Boundary for our site, we would prefer it be on the property line because it helps us out with open space credits. However, the limit of disturbance i