Forum quick links
GHG Savings for single energy source project
NC-v4.1 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
Can I assume that my 40% energy savings is also 40% in GHG given that I have only one source of energy which is electricity...
Regd. percentage improvement in greenhouse gas emissions beyond ASHRAE 90.1-2010 Appendix G
NC-v4 EAc2:Optimize energy performanceposted by Anurag Ghosh on
Hello All,
Can anyone help me understand how do i calculate the GHG emissions for a project as per ASHRAE 90.1 2010 appendix G.
Also, what does the below statement mean:
How long are EPDs valid for?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Samantha Lee on
Hi all.
Cooling Efficiency of packaged units larger than 60 tons
NC-v4 EAp2:Minimum energy performanceposted by Dave Hubka on
This week I learned that 60-ton packaged units are not provided with an EER.
How do you calculate the %?
Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workersposted by Russell Davison on
Hi All,
Regd. pressure drop adjustments in baseline fan power calculator
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello All,
External Signage with internal lighting on construction site.
CS-v4 SSc6:Light pollution reductionposted by Marine Petrosyan on
Hi, All!
I would appreciate it if you could help me with the following question:
Auditorium; lower illuminance level
NC-v4 EQc7:Daylightposted by Jody Lee Potvin-Jones on
Dear LEED forum In LEEDv4 NC it is stated in the reference manual (p735) that "Auditoriums must be included in the daylight requirements, but a lower illuminance level is acceptable; see recommend
Warehouse naturally ventilated
Warehouses-NC-v4 EAp2:Minimum energy performanceposted by Esteban Martinez on
Dear Everyone,
Long-term Bike Distance
NC-v4.1 LTc6:Bicycle Facilitiesposted by Shiva Honarvar on
Hi! I'm working on a project that includes an office tower with several retail spaces on the ground level, each having its own dedicated entrance.