Forum quick links
LEED Credit impact - On site electricity provision from LPG
NC-v4 EAp2:Minimum energy performanceposted by Robert Yates on
Hi
percentages
EBOM-v4.1 MRp1:Purchasing Policyposted by Karim Farah on
In the purchasing policy template document provided in the documentation toolkit, the proposed percentage is "75% meet sustainability criteria", where did this percentage come from and what i
WEp2 - add shower to awarded credit
NC-v4 WEp2:Indoor water use reductionposted by A&L SUSTENTABILIDADE on
During the Design Review, we have submitted the LT pre-requisite/credit Indoor Water Use Reduction and we have earned a total of 6 points.
Submitting Innovation Credits in Design Phase
CI-v4 INc1:Innovationposted by Kerry Honsinger on
We are going to do the 2 part submittal for review and will submit most of the design credits. On the LEED Online website, Innovation is considered a design credit....
Tenant doesn't install water fixtures - can automatically get 1 point for Option 1 - water analysis?
CI-v4 IPc1:Integrative processposted by Michael on
Hi, My project is interior retail, and they don't install any sanitaryware fixtures in tenant scope.
Manage rainwater partly out of the LEED project boundary
NC-v4.1 SSc4:Rainwater Managementposted by Aris Koliopoulos on
Dear All,
Excel issue with Minimum IAQ Performance Calculator
CS-v4 EQp1:Minimum indoor air quality performanceposted by Kevin Fitzgerald on
To whom it may concern,
I believe there is an issue with the v2009v4v4.1_Minimum_IAQ_Performance_Calculator_v04.xlsm "Summary" Tab.
Airflow monitoring in VAV systems
NC-v4 EQp1:Minimum indoor air quality performanceposted by Paula Rantanen on
Indirect measurements such as temperature or current transducers are not allowed for VAV systems, but is it allowable to measure the pressure difference over the fan and calculate outdoor air volu