Irrigation for a Greenhouse?
NC-v4 WEp1:Outdoor water use reductionposted by Irene Chung on
Does irrigation water use for plants in the greenhouse need to be included in the credit calculation?
Greenhouse
NC-v4 SSc6:Light pollution reductionposted by Irene Chung on
Does a greenhouse need to be included in the light pollution calculations? (e.g., the vertical illuminances and the percentage of total lumens emitted above horizontal)
Default Gravel SRI Values
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Annalise Reichert on
I am also working on a project that has a large green roof with light colored gravel in some areas. The manufacturer has not performed testing to provide an SRI value for the gravel.
LEED boundary - disturbed land that will support more than the project
NC-v4.1 MPR2:Must use reasonable LEED boundariesposted by Kimberly Reddin on
Hi,
Pressure Drop credit for DOAS system in Baseline
Schools-2009 EAp2:Minimum Energy Performanceposted by Manish Khandelwal on
Hi.
Are substations registered within a LEED project?
posted by Dalia Abdalla on
Do we need to register substations within a project as separate buildings (Under Group Approach) ? If yes, do we have to consider them for analysis under each credit.
20% or more of the design team
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Shanwen Hsu on
My project is pursuing option 2
performance period date extension
posted by Elizabeth Seidel on
We are submitting a v4 EB-OM project and need to know if the performance period for all credits ends on the same date and two (2) credits need to be extended to two weeks later - is that
v4.1 Addenda and Trips
NC-v4.1 LTc5:Access to Quality Transitposted by Jessica Eskro on
In the 4.1 addenda section it states: