Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

O&M Manual is the bible

General forums
posted by  Bazeeth Ahamed Khader Mohamed Ali  on 

I have taken the exam in Feb 2011 and passed with 187. There are no short cuts. Get familize with the reference manual. Practice questions from GBES or Ever Blue may help you more

2
Sat Sep 24, 2011, 9:52 am
8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 23, 2011, 1:23 pm

Private lavatory faucet

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Sundararaj Subburaman  on 

Hi, We have a project that consists of an office space, a laboratory, and a salon area for testing health care products.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri Sep 23, 2011, 5:05 am
2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Sep 22, 2011, 10:11 pm
3
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Thu Sep 22, 2011, 3:24 pm
3
Principal, Architect
Verde Concepts
LEEDuser Basic Member
34 thumbs up
Wed Sep 21, 2011, 6:22 pm

rating system and credit

General forums
posted by  Tristan Roberts  on 

Hi Christopher, can you ground this discussion in a specific LEED rating system and credit? I am not sure if there is a Homes vs.

2
Default Avatar
GBWorks
LEEDuser Basic Member
8 thumbs up
Wed Sep 21, 2011, 3:30 pm

Too much Window Area (WA)?

Schools-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Rebecca Griffith  on 

Is it possible to have too much window area, therefore disqualifying a room from being included in the total daylit area?

12
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Sep 21, 2011, 12:51 pm

LEED 2009 for New Construct, Optimize Energy Perform - EA CR 1

NC-2009 EAc1:Optimize Energy Performance
posted by  John Harrington  on 

I have two buidings on the same site/project boundry. Do I model the two buildings as one building?

2
Mon Sep 19, 2011, 8:40 pm

Energy coming from a off-site own renewable source

NC-2009 EAp2:Minimum Energy Performance
posted by  Jose Salinas  on 

Our project involves a production plant for pasta and support facilities in Santiago, Chile.

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Mon Sep 19, 2011, 5:26 pm