Forum quick links
Exceptional calculation - hot water use reduction in hotel
NC-2009 EAc1:Optimize Energy Performanceposted by Christine Robbins-Elrod on
We're working on a hotel that will have a reduction in hot water consumption throughout the hotel (particularly in the guestrooms, where 2.0 GPM showerheads and 1.0 GPM faucet aerators will be inst
STC Rating - ANSI S12.60-2010 exceptions
Schools-2009 IEQc9:Enhanced Acoustical Performanceposted by Rebecca Griffith on
This is a followup and additional question to my June 7, 2011 post. On 8/1/2011 a LEED Interpretation was posted for IEQc9: Enhanced Acoustical Performance (ID Number: 10095).
designated smoking areas
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Annette Bellafiore on
If you select the option that smoking is prohibited within 25' of the building, LEED Online asks you to indicate where smoking is allowed.
Schools - Combine Option 1 wtih Option 2?
Schools-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by John Drigot on
I am wondering if anyone has been successful in verifying compliance of flooring systems under Option 1 and Option 2 on the same project.
GLP certification required or could you just meet the testing..?
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Raymond Loo on
Working on a project in Hong Kong where the client is considering the purchase of some carpets that are manufactured in Japan.
Thermal Comfort in Public Spaces
CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Rick Servoss on
How would one address this credit when the CI project is made up entirely of public space?
LEED Offline Calculator Space Type Definitions/EUI's
EBOM-2009 EAc1:Optimize Energy Performanceposted by Joshua Peterson on
Is there a resource that further defines the activity space types as listed on the Case 2 LEED Offline Calculator and thier respective Source EUI's?
Tracking energy consumption through the performance period
EBOM-2009 EAc1:Optimize Energy Performanceposted by gwenedd murray on
I understand the 12 mos tracking time period can start before the performance period begins but it must also include the performance period.