Forum quick links
Moving a building
Schools-NC-v4 MRc5:Construction and demolition waste managementposted by Kath Williams on
Instead of demolition or deconstruction, this project will move an entire building across the street to another site on the campus.
BECx & ASTM E2813 Standard - Fundamental vs. Enhanced building enclosure commissioning (BECx).
NC-v4.1 EAc1:Enhanced Commissioningposted by Shahrzad Pedram on
LEED v4.1 references ASTM standard E2813 Standard Practice for Building Enclosure Commissioning regarding BECx requirements.
Stone Counter Installation / Seaming of C'tops - Wet-Applied Products on-site compliance
NC-v4.1 EQc2:Low-Emitting Materialsposted by Sara Axon on
The product that our sub uses is "Diatrex Transparent Knife Grade" & Axson Cream Hardener" for stone countertop seams and it does not meet the limits.
Indoor Air Quality
posted by Kathryn Loddengaard on
The indoor Air quality guidelines have some very specfic analytical methods i.e EPA TO-17 for volatile organic compounds.
Can you turn on RTUs to help dry materials and test equipment prior to building construction completion?
NC-v4 EQc3:Construction indoor air quality management planposted by Karen Shilo on
In the case of drying materials and to help run some tests for the commissioning processes to make sure building equipment is functioning properly, can you turn on RTUs prior to buil
Regarding Quality Views
NC-v4.1 EQc8:Quality Viewsposted by Nagaraj Sankar on
Hi all, In quality views, we need to examine atleast one of two views catagories as per our LEED V4.1 BD+C quality views. how can I prove that
What suggestions are there for the case of moisture damage from rain?
NC-v4 EQc3:Construction indoor air quality management planposted by Karen Shilo on
Is it possible to utilize heating systems during new construction in order to dry out some moisture damage from rain prior to construction completion?
Air Sampling High Rises for Recertification
EBOM-v4.1 EAp2:Fundamental Refrigerant Managementposted by Karen Shilo on
What is the best way to air sample in the most efficient and cost effective way for a residential high rise for recertification?
New LEED Resilience Working Group Opportunity due 1/13/2023
posted by Mary Ann Lazarus on
Hi all and Happy New Year: I'm writing to make sure that you're aware of the USGBC's call for members for a new LEED Resilience Working Group. See below. The deadline is comi