Question regarding Occupancy sensor

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Nagaraj Sankar  on 

How can we show and  prove, here are the palces we gave an ocupancy and daylight sensor for manufacturing project? and Is there gudelines used to follow to place sensor on 

0

tools/process for modeling roof deck surface temperature

Green Commons
posted by  Chris Flint Chatto  on 

Anyone aware of tools or workflows for modeling of a specific outdoor space and effective surface temperatures?  We've done a goodly amoutn of microclimate simulations, but never explicitly fa

5
Senior Energy Wizard
TLC Engineering Solutions
LEEDuser Premium Member
44 thumbs up
Wed Dec 28, 2022, 5:40 pm

Commingled Waste v4 Documentation

NC-v4 MRc5:Construction and demolition waste management
posted by  Samantha Lee  on 

What is required to be submitted for commingled waste in LEED Version 4? Does the commingled waste have to sent to a Certified Recycling Institute?

 

5
Default Avatar
Sustainability Engineer
Turner Construction
LEEDuser Premium Member
0 thumbs up
Tue Dec 27, 2022, 4:13 pm
1
Fri Dec 30, 2022, 3:47 pm

exhaust fan/fume hood

Schools-NC-v4 EQp3:Minimum acoustic performance
posted by  Kai Starn  on 

Hi, working on a new school k-12 project with a chemistry lab. Does the 40 dBA background noise requirement need to be met concerning the fume hood?

3
Fri Dec 23, 2022, 7:40 pm

LEED v4.1 If all products in one category comply with the VOC emissions evaluation do we need to list the cost or surface area?

NC-v4 EQc2:Low emitting materials
posted by  Summer Gorder  on 

We are having a tough time getting the costs from our subs. The subs says that the cost is bundled with other material and they can't break it up.

0

LEED O+M v4 Pilot Credit Integrative Process- Participation in the Forum

Pilot-Credits IPpc101:Integrative Process
posted by  Yanjun Xing  on 

Our project is pursuing LEED O+M plantinum certification, during the whole O&M period, we establish an integrative process team to improve our work efficiency. According to the owner’s pro

0

TX losses

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Omar Elrawy  on 

Hi,

Just to confirm, for LEED Datacentre we do not model the transformer losses right?
Hence we do not have specific requirement for the losses at different part load?

0
3
Director of Sustainable Design
EwingCole
LEEDuser Premium Member
3 thumbs up
Wed Dec 21, 2022, 5:54 pm

Daylight Study - Approach for partial wall coverings / multiple materials

CI-v4.1 EQc7:Daylight
posted by  Yarden Harari  on 

Hi All,

Has anyone come across a project that has multiple treatments on a wall (like an acoustic band), or multiple flooring finishes that are similar in shade / reflectance values?

1