Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Office Transient

NC-2009 PIf1:Minimum Program Requirements
posted by  Nate Steeber  on 

I received some technical advice on my project regarding the occupancy. I have a mixed-use building. Primarily office spaces with a tenant fit out cafe and restaurant.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Wed Oct 8, 2014, 10:53 pm

How to count curtain walls?

CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Patrizia Laplana  on 

We have a question regarding how to count the area of a curtain wall that will be replaced in C+S renovation project.

3
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Tue Oct 7, 2014, 9:44 pm

Exterior Disinfectants

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Michelle Rosenberger  on 

We have an urban project that is adjacent to an alley way. The project has an issue with public urination in that alley. As a result, they use security patrols to dissuade the practice.

2
Tue Oct 7, 2014, 8:16 pm

SSc4.3 as it relates to SSc4.4 Opt 3 "no new parking"

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Jason Biondi  on 

Our project is a new classroom building, on a college campus, whereby no new parking is being built or provided.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Oct 7, 2014, 6:07 pm

Table 1 is compulsory

EBOM-v4 WEp1:Indoor water use reduction
posted by  OSCAR DE LA RED  on 

it is required to comply with the table 1 for each fixture as it seems to state in the establisment period for option 1 calculated water use, or it is enough to comply with the baseline 120% o 150%

2
Sustainability Advisor
Transwestern Sustainability Services
LEEDuser Basic Member
12 thumbs up
Tue Oct 7, 2014, 5:43 pm

Indoor water use Reduction Calculator bug

EBOM-v4 WEp1:Indoor water use reduction
posted by  OSCAR DE LA RED  on 

There is a bug in the Indoor water use Reduction Calculator when there is no urinals, the male water closet uses per day are set to 4 instead of 3 uses per day. How can we solve this?

4
Sustainability Advisor
Transwestern Sustainability Services
LEEDuser Basic Member
12 thumbs up
Tue Oct 7, 2014, 5:19 pm

VOC Compliant Chemicals - IEQ3.3

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  Jessica Wasmuth  on 

I am working on compiling a list of our Green Chemicals used onsite for a LEED certification.

3
Tue Oct 7, 2014, 3:55 pm

Confused about Perf periods and 2-yr contract for offsite REC's

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  Wendy Parker, LEED AP  on 

We purchased REC's (Texas products) for backdates 3/13 to 3/14 AND going forward 3/14 to 3/15 to cover both the Perf Period AND the 2 yr contract requirement for the credit.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Oct 7, 2014, 1:19 pm

Addition added after documentation has been submitted

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Angela Bickford  on 

I think I know this answer to this, but I can't find an answer anywhere so I would like someone else's opinion. I'm working on a LEED for schools project. About 3/4 of the building was renovated.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Oct 7, 2014, 12:21 pm

Concrete Washout

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Paula Hernandez  on 

Hello everyone, we are working on a project in an estate, part of this estate is the current LEED project, with its own LEED boundary.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Mon Oct 6, 2014, 12:00 pm