Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Carparking spaces located under ground level

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  FABIO VIERO  on 

We have 100% of carparking spaces located in 2 stories below ground level. All the roofs of the upper floor form the pedestrian hardscape for the plaza situated above.

1
Tue May 6, 2014, 3:09 pm

EPD of imported Products and Materials

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  María Fernanda Aguirre  on 

Here in Chile, currently we do not have many products with EPD or running LCA (we are on our way and moving fast to do so), thus, many of the products having EPD (specific and generic) are imported

1
Mon Apr 14, 2014, 9:50 pm

Mixed Use Building Residential + Commercial

NC-2009 EAc5:Measurement and Verification
posted by  Saju Varghese  on 

We are working in a project for which we will be pursuing LEED NCv2009. It is a mixed use (residential and commercial) building.

1
Wed Apr 2, 2014, 1:57 pm

LEED Options

LEED Rating System Selection
posted by  Ran Zhang  on 

A client of mine just bought a partial complete building, which is bascally a shell of concrete structure but intended to be a commercial office building for leasing after full completion.

1
Mon Apr 7, 2014, 4:09 pm

BOD

LEED Rating System Selection
posted by  Ebenezer Natoplag  on 

Can somebody give me a copy of LEEDuser (BOD Document) - Basis of Design

1
Wed Apr 2, 2014, 1:05 pm

Measurement at DOAS before fixed dampers

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Noriko Nagazumi  on 

From the reference guide: "Show compliance with the applicable requirement above through measurements taken at the system level (i.e., the air-handling unit).

1
Fri Apr 11, 2014, 8:14 pm

ASHRAE and voltage drop

CS-2009 EAp2:Minimum Energy Performance
posted by  BH .  on 

ASHRAE puts a requirement to keep in electrical services on the feeders max 2% voltage drop and on the branch circuits max 3%.

1
Wed Apr 2, 2014, 2:15 pm

Spot Metering for CI 2009 EAc3 Option B

CI-2009 EAc3:Measurement and Verification
posted by  Michael Hill  on 

I am working on a project which is considering pursuing CI 2009 EAc3 Option B. I am wondering if continuous metering is required for this path or if spot metering would be acceptable.

1
Mon Apr 7, 2014, 1:15 pm

purchasing merchandise for resale

EBOM-2009 IOc1:Innovation in Operations
posted by  ethan adams  on 

We are a non-profit org. with a modest, but growing, merchandise sales program.

1
Wed Apr 30, 2014, 4:07 pm

CAMPUS Approach For Rainwater Management

EBOM-v4 SSc2:Rainwater management
posted by  Patricia Andrasik  on 

I am currently analyzing and attempting to achieve the Campus credit for Rainwater Management for a university that is projected to change in the following 5-10 years.

1
Thu Apr 10, 2014, 8:41 pm