Carparking spaces located under ground level
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by FABIO VIERO on
We have 100% of carparking spaces located in 2 stories below ground level. All the roofs of the upper floor form the pedestrian hardscape for the plaza situated above.
EPD of imported Products and Materials
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by María Fernanda Aguirre on
Here in Chile, currently we do not have many products with EPD or running LCA (we are on our way and moving fast to do so), thus, many of the products having EPD (specific and generic) are imported
Mixed Use Building Residential + Commercial
NC-2009 EAc5:Measurement and Verificationposted by Saju Varghese on
We are working in a project for which we will be pursuing LEED NCv2009. It is a mixed use (residential and commercial) building.
LEED Options
posted by Ran Zhang on
A client of mine just bought a partial complete building, which is bascally a shell of concrete structure but intended to be a commercial office building for leasing after full completion.
BOD
posted by Ebenezer Natoplag on
Can somebody give me a copy of LEEDuser (BOD Document) - Basis of Design
Measurement at DOAS before fixed dampers
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Noriko Nagazumi on
From the reference guide: "Show compliance with the applicable requirement above through measurements taken at the system level (i.e., the air-handling unit).
ASHRAE and voltage drop
CS-2009 EAp2:Minimum Energy Performanceposted by BH . on
ASHRAE puts a requirement to keep in electrical services on the feeders max 2% voltage drop and on the branch circuits max 3%.
Spot Metering for CI 2009 EAc3 Option B
CI-2009 EAc3:Measurement and Verificationposted by Michael Hill on
I am working on a project which is considering pursuing CI 2009 EAc3 Option B. I am wondering if continuous metering is required for this path or if spot metering would be acceptable.
purchasing merchandise for resale
EBOM-2009 IOc1:Innovation in Operationsposted by ethan adams on
We are a non-profit org. with a modest, but growing, merchandise sales program.
CAMPUS Approach For Rainwater Management
EBOM-v4 SSc2:Rainwater managementposted by Patricia Andrasik on
I am currently analyzing and attempting to achieve the Campus credit for Rainwater Management for a university that is projected to change in the following 5-10 years.