Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
0

Bicycle storage installation

NC-v4 LTc6:Bicycle facilities
posted by  Subhashkumar A  on 

The project involves establishing bicycle parking facilities within our campus. This storage system ensures safety by providing parking tokens and installing a surrounding fence.

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Mon Apr 15, 2024, 3:58 am
2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Mon Apr 15, 2024, 3:55 am

Bicycle path width

CS-v4 LTc6:Bicycle facilities
posted by  Agnieszka Rylska  on 

Next to our project there is a city network of bicycle paths (marked lanes on a pavement) leading to many diverse uses and rapid transit stops.

4
CES Clean Energy Solutions GmbH
LEEDuser Basic Member
7 thumbs up
Mon Apr 15, 2024, 3:52 am

Mean Lamp Lumens

EBOM-v4 SSc4:Light pollution reduction
posted by  Subhashkumar A  on 
Hi all! I need clarification regarding mean lamp lumens for light pollution reduction credit. Most specification sheets of light fixtures only show the initial lumens value, not mean lamp lumens.
1
Fri Apr 19, 2024, 12:54 pm

Building and District Hydronic System Analysis Software

Sustainable MEP Leaders
posted by  Victor Braciszewski  on 

Hi All - 

Has anyone explored hydronic system analysis software (1D CFD)? 

2
Mechanical Engineering Leader
Harley Ellis Devereaux (HED)
LEEDuser Basic Member
0 thumbs up
Fri Apr 12, 2024, 7:46 pm

Heat Island Reduction - vegetated surface - modular systems

NC-v4 SSc5:Heat island reduction
posted by  Ricardo Hernandez  on 

Hi Forum, can anyone confirm that a modular vegetated systems (plastic modules with ecomembrane, above ground) can count on the calculations for the vegetated surface, i would like to implement a r

1
Mon Sep 2, 2024, 6:21 pm

Kitchen Baseline System

NC-v4 EAp2:Minimum energy performance
posted by  Saif Abdulameer  on 

I am working on a hotel where system 6 is the baseline for the podium, one of the spaces is a kitchen served by a single zone VAV 100% outdoor air unit.

6
Thu Apr 11, 2024, 9:01 pm

LEED Accredited Professional Credit - AP flexibility

LEED v5 BD+C/ID+C: Project Priorities and Innovation Public Comments
posted by  Edgar Arevalo  on 

So I'm working on LEED v4 ID+C projects where, after following advice from a post in this form for the LEED v4.1 version of this credit, I can use my AP BD+C credentials to comply with th

0