LTc Compact & Connected
posted by Emily Purcell on
"The counted uses must represent at least three of the five categories, exclusive of the building’s primary use category."
Pilot Closed - attending LEED v4.1 Optimize Process Water Use
Pilot-Credits WEpc94:No Cooling Towerposted by Adriana Hansen on
This pilot credit has been used in many office projects with VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1 in
Pilot Closed - attending LEED v4.1 Optimize Process Water Use
Pilot-Credits WEpc94:No Cooling Towerposted by Adriana Hansen on
This pilot credit allows to many office buildings that have a VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1 includ
EAc Reduce peak thermal loads
posted by Emily Purcell on
Very happy to see a heavily weighted credit breaking out thermal loads from the whole building energy model credit.
Number of eligible Innovation credits from Pilot Credits
NC-v4 INc1:Innovationposted by Jason Garvens on
Can anyone confirm the number of points that can be earned solely through achieving Pilot credits?
EAc2 Optimize Energy Performance: Baseline Building Heating Source
NC-v4 EAc2:Optimize energy performanceposted by Ricardo Sá on
Wind PPA OR PV garden question
NC-v4 EAc5:Renewable energy productionposted by Kyu-min Lee on
Hello,LEEDuser!!!!
My project is planning to contract at least 10year more than 10 Gwh.(not confirmed about wind or PV but the amount is fixed, located in same utility service area)
CONSTRUCTION WASTE HEATED FOR CLINKER PRODUCTION, COUNTED AS WASTE DIVERSION?
NC-v4 MRp2:Construction and demolition waste management planningposted by Olga Yuil on
For a project located in Central America, construction waste is used for clinker production. For this purpose, construction waste is heated to temperatures above 900C.
can I get point with double contraction ??
NC-v4 EAc4:Demand responseposted by Kyu-min Lee on
Hi,
While planning to obtain platinum level certification, there are difficulties in proving contractual matters such as demand response.
Bike storage distance
NC-v4 LTc6:Bicycle facilitiesposted by Pia Öhrling on
How do you calculate the distance if the bike storage is inside the building basement and you can bike to it after you have entered the door?