Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LTc Compact & Connected

LEED v5 BD+C/ID+C: Location and Transportation Public Comments
posted by  Emily Purcell  on 

"The counted uses must represent at least three of the five categories, exclusive of the building’s primary use category."

1
Tue Apr 16, 2024, 6:59 pm

Pilot Closed - attending LEED v4.1 Optimize Process Water Use

Pilot-Credits WEpc94:No Cooling Tower
posted by  Adriana Hansen  on 

This pilot credit has been used in many office projects with VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1 in

0

Pilot Closed - attending LEED v4.1 Optimize Process Water Use

Pilot-Credits WEpc94:No Cooling Tower
posted by  Adriana Hansen  on 

This pilot credit allows to many office buildings that have a VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1 includ

0

EAc Reduce peak thermal loads

LEED v5 BD+C/ID+C: Energy and Atmosphere Public Comments
posted by  Emily Purcell  on 

Very happy to see a heavily weighted credit breaking out thermal loads from the whole building energy model credit.

0

Number of eligible Innovation credits from Pilot Credits

NC-v4 INc1:Innovation
posted by  Jason Garvens  on 

Can anyone confirm the number of points that can be earned solely through achieving Pilot credits? 

16
Tue Apr 16, 2024, 12:59 am

EAc2 Optimize Energy Performance: Baseline Building Heating Source

NC-v4 EAc2:Optimize energy performance
posted by  Ricardo Sá  on 
Hello. I have a question regarding LEED v4 NC, EAc2 Optimize Energy Performance: We’re currently involved in a project that is considering the use of biomass as heating source (space heating and dom
2
Tue Apr 16, 2024, 12:55 am

Wind PPA OR PV garden question

NC-v4 EAc5:Renewable energy production
posted by  Kyu-min Lee  on 

Hello,LEEDuser!!!!

My project is planning to contract at least 10year more than 10 Gwh.(not confirmed about wind or PV but the amount is fixed, located in same utility service area)

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Apr 15, 2024, 8:28 pm

CONSTRUCTION WASTE HEATED FOR CLINKER PRODUCTION, COUNTED AS WASTE DIVERSION?

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Olga Yuil  on 

For a project located in Central America, construction waste is used for clinker production. For this purpose, construction waste is heated to temperatures above 900C.

0

can I get point with double contraction ??

NC-v4 EAc4:Demand response
posted by  Kyu-min Lee  on 

Hi,

 

While planning to obtain platinum level certification, there are difficulties in proving contractual matters such as demand response.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Apr 15, 2024, 5:40 pm

Bike storage distance

NC-v4 LTc6:Bicycle facilities
posted by  Pia Öhrling  on 

How do you calculate the distance if the bike storage is inside the building basement and you can bike to it after you have entered the door?

6
Mon Apr 15, 2024, 4:33 pm