Topic | Recent |
---|---|
Div. 33- UtilitiesNC-2009 MRc4: Recycled Contentposted by Marco Valerio Ceccotti on Sep 21, 2017, 6:56 am
Our Design Team is asking to the Contractor to track and collect... Last reply: Marco Valerio Ceccotti, Oct 2, 2017, 11:59 am |
|
Building RelocationNC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roofposted by Nativa Architecture on Mar 9, 2016, 5:30 am
If we decide to move a pavilion from Expo area to a new site, shall we take any "Building... Last reply: Tristan Roberts, Aug 26, 2017, 5:53 pm |
|
Heat recovery and dehumidificationNC-2009 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Aug 8, 2017, 5:01 am
In a swimming pool removing latent heat is necessary all the year round. Last reply: Marcus Sheffer, Aug 8, 2017, 9:53 am |
|
consumption and demandNC-v4 EAc3: Advanced Energy Meteringposted by Francesco Passerini on Jul 18, 2017, 9:48 am
Does "Electricity meters must record both consumption and demand" mean that both... Last reply: Marcus Sheffer, Jul 18, 2017, 10:16 am |
|
Water metering for Fire safetyRetail-NC-v4 WEc4: Water meteringposted by ilenia ottati on Jul 3, 2017, 6:38 am
Does water meter for fire emergency counts as additional meter for process water? In our project a tank is filled with water coming from municipal facility. Do you think that metering that kind... Last reply: Tristan Roberts, Jul 11, 2017, 12:22 pm |
|
UNITS FOR SIMULTANEOUS&INDEPENDENT PRODUCTION OF HOT&COLD WaterCS-v4 EAp2: Minimum Energy Performanceposted by Giuseppina Amorusi on Jun 30, 2017, 5:39 amMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5867 thumbs up June 30, 2017- 9:57 am This is probably not the best place to ask software specific questions about how to model something. You can try BLDG-SIM at onebuilding.org or some of the other discussion forums or the Energy Plus help desk. If the software can't model your system directly then you would need to employ a work around. If you do so for LEED you must follow the exceptional calculation method and ideally base your work around on something that has been published. Often manufacturers of equipment... Last reply: Marcus Sheffer, Jun 30, 2017, 9:57 am |
|
EAP2_Humidification ModelingCS-v4 EAp2: Minimum Energy Performanceposted by Giuseppina Amorusi on Jun 30, 2017, 3:55 am
Hi all, Last reply: Marcus Sheffer, Jun 30, 2017, 9:53 am |
|
Airport building:posted by alessandro santuari on Jun 29, 2017, 5:46 am
Our project refers to an addiction and renovation to an existing airport terminal (only building and a limited outdoor area). |
|
EA Credit 2NC-2009 EAc2: On-Site Renewable Energyposted by Cristina Parenti on May 26, 2017, 5:52 am
Hello, Last reply: Marcus Sheffer, May 26, 2017, 10:53 am |
|
mandatory provisions for systems that are not in scope of workCS-v4 EAp2: Minimum Energy Performanceposted by Alessandro Speccher on May 17, 2017, 1:13 pm
hi all, Last reply: Alessandro Speccher, May 18, 2017, 10:44 am |