Does a remediated Ash basin qualify for LTc2...?!

NC-v4 LTc2:Sensitive land protection
posted by  Olawale Taiwo  on 

My project is sited on a land mass which happens to be a remediated ash basin site on a facility which is now being transformed into a gas powered plant ( from a coal plant) and has now transformed

2
Director of Sustainability
NORR
LEEDuser Expert
7 thumbs up
Thu Aug 9, 2018, 1:42 pm

Single Zone Variable-Air Volume Controls

NC-v4 EAp2:Minimum energy performance
posted by  Gabriela Mena   on 

We are the CxA of a hospital that have some requirements of meeting positive or negative pressures in some spaces, for this systems the project cannot comply with the requirement of reducing the ai

1
Fri Aug 10, 2018, 4:11 pm

Theoretical vs. As-Applied VOC content

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Matthew Perna  on 

The MSDS for one component of a 4-part sparkproof/conductive flooring system lists a theoretical VOC content level (i.e. as packaged) and an As-Applied content level.

2
Wed Aug 8, 2018, 6:33 pm

REC Types

NC-v4 EAc7:Green power and carbon offsets
posted by  Martin Christensen  on 

Hi, I understand that the RECs need to be Green-e certified but their are different types of recs in MA where my building is located.

1
Wed Aug 8, 2018, 8:25 pm

Site vegetated when project started; however it was previously developed

NC-v4 LTc2:Sensitive land protection
posted by  Helen Kessler  on 

Our v4 project is on a site that previously had a housing development.  This development was removed some time ago and the land now has grass and trees.  We would like to say it was previ

1
Wed Aug 8, 2018, 6:54 pm

HAVC zoning and controls

CI-v4 EAc2:Optimize energy performance
posted by  Amy L  on 

For controls in perimeter offices or perimeter nondensely occupied specialty use spaces, it says ‘a separate thermal control for each space paired with an occupant-sensing or CO2-sensing device

5
Wed Aug 8, 2018, 4:16 pm
6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Aug 8, 2018, 3:38 pm

Reclaimed land from sea

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Bazeeth Ahamed K M  on 

"All LEED projects must be constructed and operated on a permanent location on existing land" So reclaimed land from sea(artificial island) would not be eligible for LEED V 4 as they are not existi

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Aug 8, 2018, 3:18 pm