Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Bicycle Storage for transitional housing for homeless

NC-v4 LTc6:Bicycle facilities
posted by  Summer Gorder  on 

I am working on a Behavioral Health Resource Center for Multnomah County, and I am not sure how to classify the occupants for the calculations.

1
Thu Dec 5, 2019, 4:05 pm

Monitoring : Natural Ventilation

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Premal Solanki  on 

We are working on a residential project (5-Story) that is being certified v4 BD+C. The dwelling units are naturally ventilated.

2
Director
Semtrio Sustainability Consulting
LEEDuser Basic Member
0 thumbs up
Wed Dec 4, 2019, 12:12 pm

LBC Red List Vetting Procees

SC Leaders
posted by  Mike Bahr  on 

Hey group,

7
Sustainability Manager
GE Johnson Construction
LEEDuser Basic Member
0 thumbs up
Tue Dec 3, 2019, 4:29 pm
5
Tue Dec 3, 2019, 11:04 am

Refurbishment of an existing building

LEED Rating System Selection
posted by  Ricardo Filho  on 

Hi, I will be leading a LEED project and I am struggling to identify the rating system I should use, I requested some information from the project managers and I got this answer:

 

4
Mon Dec 2, 2019, 8:29 pm

EA CR 02 - Qualified List

NC-2009 EAc2:On-Site Renewable Energy
posted by  SAMY Chamy  on 

Dear Concern:- I have some doubt in this credit 1.Off site renewable energy is Qualified for this credit 2.Is there any specific distance for off site (like kilometres / Miles) 3.Is there any poi

4
Default Avatar
Sr. Sustainable Design Specialist
HOK
LEEDuser Basic Member
1 thumbs up
Mon Dec 2, 2019, 6:01 pm

50% unbound

Healthcare-v4.1 SSc5:Heat Island Reduction
posted by  Lene Hill  on 

What does unbound mean? How is unbound determined?  Does a paver such as Unilock Eco-optilock meet that requirement?

0

Exemplary Performance

CS-v4 EAc2:Optimize energy performance
posted by  Maria Porter  on 

Is the Exemplary Performance threshold 54 % for CS as well (like NC?) The leap seems bigger for CS project than for NC Projects, based on that the table ends on 47 % for CS and 50 % for NC, both ac

2
Mon Dec 2, 2019, 2:21 pm

LEED BD+C: Retail or LEED ID+C: Retail?

LEED Rating System Selection
posted by  Borja Sánchez  on 

Hi, I have a doubt of what rating system is more adequate for a new LEED project that we are working on.

5
Architect
ÁRBOL Aquitectura Sostenible
LEEDuser Basic Member
0 thumbs up
Mon Dec 2, 2019, 1:02 pm

Energy model as per ASHRAE 90.1-2013

Retail-NC-v4 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings,

We art to prepare an energy model for a project, which should be in accordance with ASHRAE 90.1-2013.

1
Mon Dec 2, 2019, 6:10 pm