Optimization 27 - antimicrobial activity for surfaces
posted by Dionisio Franca on
First question: The optimization (read credit) requires: countertops, water fixtures, doorknobs, lightswitches to meet EPA testing requirements for antimicrobial activity.
IP-based control system tied to individually controlled fixtures overhead
NC-v4 EQc6:Interior lightingposted by Ciaran McCabe on
Has anoyone gained Option 1 using an IP based control system. If every light fitting can be controlled via an IP based system will this achieve complaince with Option.
Concrete bonding agent
NC-v4.1 EQc2:Low-Emitting Materialsposted by Laura Charlier on
We had a submittal come in that is proposing the use of a "bonding slurry" to be used above grade between the metal deck and concrete slab for each building story.
Public Project Currently Purchasing REC's for all Electricity for all Building looking to add Natural Gas Carbon Off-sets
NC-v4 EAc7:Green power and carbon offsetsposted by Summer Gorder on
I am working on a few projects for a public agency that purchases REC's for all of their buildings electricity, and they would like to add natural gas.
Number of different crops using herbs
Pilot-Credits SSpc82:Local food productionposted by Gustavo De las Heras Izquierdo on
Hallo, our project team is pursuing this credit and we have an enquiry that some of you might be able to solve:
LEED Credential Maintenance and Project Participation Hours
posted by Scott Edwards on
Regarding claiming hours for working on a LEED registered project, I've seen that "Work on projects registered for LEED...
Vegetated external shades
CS-v4 EAp2:Minimum energy performanceposted by Maria Grimm on
I am working on a project that is designing external vegetated shades/screens. For local code compliance, we are not allowed to include the vegetated shades in our energy model.
NC / CS Mix
NC-v4 EAp2:Minimum energy performanceposted by Maria Grimm on
Question regarding a project that is registered as NC. The project is a approximately 70% residential (NC) and 30% core & shell office.
Introduction
posted by Summer Minchew on
I am new to the SAL and honored to be included. I'm Summer, managing partner at Ecoimpact Consulting.
Envelope commissioning
NC-v4 EAc1:Enhanced commissioningposted by Ricardo Sá on
Dear All,
In the context of a large new Office Building (22 000 m2) which field-tests are required as a minimum under the scope of Building’s Envelope Commissioning?