Topic | Recent |
---|---|
Core and Shell selection- QuestionLEED Rating System Selectionposted by Konstantina Kalliakoudi on Mar 13, 2023, 12:24 pm
Hello to all LEED users, I have a project which is a new construction of an Office building. The Owner will rent each floor to tenants. Each Floor will be designed as an Open... Last reply: Dave Hubka, Mar 14, 2023, 7:56 am |
|
Modeling Toilet exhaust fansNC-2009 EAp2: Minimum Energy Performanceposted by Matt Scott on Nov 5, 2013, 11:55 am
Let's say you have a proposed zone being conditioned by an RTU with only a supply fan and you also have a small exhaust fan exhausting air directly from a toilet room, and that's the extent of... Last reply: Julio Fernandez Amodia, Mar 14, 2023, 4:49 am |
|
Plug loads for server roomsNC-2009 EAp2: Minimum Energy Performanceposted by MARCIO OROFINO on Apr 22, 2015, 4:39 pm
Hi. Last reply: Jean Marais, Mar 14, 2023, 4:39 am |
|
Documentation for No Cooling TowerPilot-Credits WEpc94: No Cooling Towerposted by Marelle Davey on Feb 2, 2022, 6:37 pmIn addition to the Credit Specific documentation, you will need to provide proof that you participated in the LEEDuser forum, and completed the USGBC feedback survey. Log in or register to post comments... Last reply: Konstantina Kalliakoudi, Mar 14, 2023, 4:20 am |
|
Do we need to included tenant area in renewable energy calculation for CS building?CS-v4 EAc5: Renewable energy productionposted by Yoyo Shek on Feb 9, 2023, 10:45 pm
Dear All, We are doing a LEEDv4 CS project and I am not sure whether those tenant controlled areas such as shop and office are required to include in the calculation of %... Last reply: Marcus Sheffer, Mar 13, 2023, 3:35 pm |
|
locker romsPilot-Credits WEpc147: All-Gender Restroomsposted by Belén Palao on Apr 27, 2022, 12:45 pmPaula Melton Editorial Director BuildingGreen, Inc. LEEDuser Moderator 172 thumbs up April 28, 2022- 11:21 am Hi, Miguel! I'm hoping someone on here might have an answer for you. However, just keep in mind that posting to LEEDuser is not the same as writing to LEED Coach. This is an independent grassroots forum. The email for LEED Coach is leedcoach@usgbc.org. Log in or register to post comments Zeynep Cakir LEED AP BD+C, WELL AP, Sustainable Building Consultant ECOBUILD LEEDuser Basic Member 9 thumbs up March 13, 2023- 9:12 am Dear Miguel, Have you received any feedback from the LEED... Last reply: Zeynep Cakir, Mar 13, 2023, 9:12 am |
|
Warehouse ventilation filtration systemWarehouses-NC-v4 EQp1: Minimum indoor air quality performanceposted by Gabriela Mena on Nov 24, 2020, 1:53 pm
I am working on a warehouse project that has supply fans (wall mounted) to ventilate the space, we are pursuing the Enhanced... Last reply: Dave Hubka, Mar 11, 2023, 11:12 pm |
|
Option F: If furniture is included...NC-v4 EQc6: Interior lightingposted by John Mlade on Mar 9, 2023, 3:14 pm
Hi all, Curious if it may be possible to consider furniture and pursue Option F if furniture is NOT included in other credit calculations. In our case, the building will be furnished by... Last reply: Dave Hubka, Mar 11, 2023, 11:04 pm |
|
Integrative Process FacilitatorLEED v4.1 Discussion Forumposted by Edward Reifenstein on Mar 9, 2023, 6:39 pmNadav Malin President BuildingGreen, Inc. LEEDuser Moderator 834 thumbs up March 9, 2023- 8:02 pm Hi Edward, USGBC isn't specific about this but, in my experience, the facilitator can be either a member of the design team or someone engaged specifically to facilitate this process. You might also want to repost this question to the LEEDuser forum for that specific credit and see what the people there have to say. Good luck! Log in or register to post comments Dave Hubka Practice Leader- Sustainability EUA LEEDuser Expert 396 thumbs up March 11, 2023- 10:53 pm It is my opinion that an experienced LEED... Last reply: Dave Hubka, Mar 11, 2023, 10:53 pm |
|
Food Service EquipmentCI-v4 EAc5: Enhanced Refrigerant Managementposted by ESD Engineer on Mar 22, 2016, 5:30 pm
For a LEEDv4 CI project, does food service equipment such as ice cube machines, ice machines, and chiller freezers need to be documented? Last reply: Dave Hubka, Mar 11, 2023, 10:50 pm |