Log in
Forum » U.S. and Canada
Topic

Where to find the Ecologo-certified products?

EBOM-2009 IEQc3.3: Green cleaning - purchase of sustainable cleaning products and materials
posted by Helen Samuel on May 18, 2015, 9:10 pm

Now that Ecologo was acquired by UL, where can I find which products are Ecologo-certified? The UL website requires that you purchase their standards - but is there still some sort of database...

Last reply: Garrett Gerst, May 19, 2015, 9:35 am

Molok Containers for MRp1

CS-2009 MRp1: Storage and Collection of Recyclables
posted by Kristopher Lashley on Oct 17, 2014, 1:28 pm

We are looking to install a 5000L Molok recycling bin for a LEED 2009 CS building that will be a restaurant. According to the reference guide a 11.6m recycling area would be required. However we...

Last reply: Deborah Lucking, May 18, 2015, 4:12 pm

EV Ready acceptable?

CS-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Dylan Connelly on Apr 29, 2015, 1:21 pm

For Core & Shell projects - is installing 3% of the parking stalls to be EV ready acceptable to achieve these points? Idea is that the tenants will be responsible for installing the actual...

Last reply: Ellen Mitchell, May 18, 2015, 4:00 pm

EAc5 Option 3

NC-2009 EAc5: Measurement and Verification
posted by Sheryl Swartzle on May 18, 2015, 2:39 pm

Our client chose Option 2 on the PIf1 and the form has been approved. They have decided to pursue the 1 point available in EAc5 for choosing Option 1 in PIf1. Is it acceptable to update PIf1...

Last reply: Sheryl Swartzle, May 18, 2015, 3:34 pm

Tools for demonstrating solar orientation

Homes-v2008 IDc1: Integrated project planning
posted by Erica Downs on May 10, 2015, 8:08 pm

Is anyone aware of any tools for demonstrating the east-west axis of the house is within 15 degrees of due east-west? Or do I need to bust out my protractor?

Last reply: Erica Downs, May 18, 2015, 11:39 am

Addition To An Existing Certified Building

NC-2009 MPR2: Must be a complete, permanent building or space
posted by Timothy VanOudenhoven on Oct 10, 2014, 4:38 pm

I am currently working on a project where an existing certified building will have major renovation to the interior of the existing and an addition added to the existing certified building....

Last reply: Marcus Sheffer, May 18, 2015, 9:24 am

AstroTurf

EBOM-2009 WEc3: Water Efficient Landscaping
posted by Alexis Voeltner on May 11, 2015, 2:15 pm

What is LEED's stance on AstroTurf? I have a building that replaced all of their grass with this and am curious if it is now considered hardscape.

Last reply: Kimberly Schlaepfer, May 15, 2015, 2:48 pm

EA Pr2 Form V5- EAp2-9

Schools-2009 EAp2: Minimum Energy Performance
posted by Robert Barrett on May 14, 2015, 2:25 pm

My project does not comply with section 1.9A (minimum compliance requirements for...

Last reply: Marcus Sheffer, May 14, 2015, 2:45 pm

LEED NC 2009 Group Certification

NC-2009 PIf1: Minimum Program Requirements
posted by Neumann Monson on May 13, 2015, 6:17 pm

Our project consists of two buildings on a shared site, to be built in two phases. The first building consists of an underground level of parking, one level of...

Last reply: Trista Brown, May 14, 2015, 12:25 pm

Combined Staff Break Room and Cleaning Materials Storage

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Ryan Hoffman on May 13, 2015, 6:06 pm

Our project is the renovation of a space that will be cleaned by an outside contractor. This contractor is being given one large room that will be both the staff break room and the materials...

Last reply: Michelle Halle Stern, May 14, 2015, 12:08 pm