Requirements
Prerequisites
1.1 Preliminary rating. As early as practical, conduct a preliminary LEED for Homes meeting, with the participation of the Provider and key members of the project team. As part of the meeting, create an action plan that identifies the following:- The targeted LEED award level (Certified, Silver, Gold, or Platinum).
- The LEED for Homes credits that have been selected to meet the targeted award level.
- The party accountable for meeting the LEED for Homes requirements for each selected credit.
Credits
1.2 Integrated project team (1 point). Assemble and involve a project team to meet the three criteria below:- Include team members, in addition to the builder and Verification Team, whose capabilities include at least three of the following skill sets:
- architecture or residential building design;
- mechanical or energy engineering;
- building science or performance testing;
- green building or sustainable design; and
- civil engineering, landscape architecture, habitat restoration, or landuse planning.
- conceptual or schematic design;
- LEED planning;
- preliminary design;
- energy and envelope systems analysis or design;
- design development;
- final design, working drawings or specifications; and
- construction.
- The glazing area on the north- and south-facing walls of the building is at least 50% greater than the sum of the glazing area on the east- and west facing walls.
- The east-west axis of the building is within 15 degrees of due east-west.
- The roof has a minimum of 450 square feet of south-facing area that is oriented appropriately for solar applications.
- At least 90% of the glazing on the south-facing wall is completely shaded (using shading, overhangs, etc.) at noon on June 21 and unshaded at noon on December 21.
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
See all forum discussions about this credit »Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Prerequisites
1.1 Preliminary rating. As early as practical, conduct a preliminary LEED for Homes meeting, with the participation of the Provider and key members of the project team. As part of the meeting, create an action plan that identifies the following:- The targeted LEED award level (Certified, Silver, Gold, or Platinum).
- The LEED for Homes credits that have been selected to meet the targeted award level.
- The party accountable for meeting the LEED for Homes requirements for each selected credit.
Credits
1.2 Integrated project team (1 point). Assemble and involve a project team to meet the three criteria below:- Include team members, in addition to the builder and Verification Team, whose capabilities include at least three of the following skill sets:
- architecture or residential building design;
- mechanical or energy engineering;
- building science or performance testing;
- green building or sustainable design; and
- civil engineering, landscape architecture, habitat restoration, or landuse planning.
- conceptual or schematic design;
- LEED planning;
- preliminary design;
- energy and envelope systems analysis or design;
- design development;
- final design, working drawings or specifications; and
- construction.
- The glazing area on the north- and south-facing walls of the building is at least 50% greater than the sum of the glazing area on the east- and west facing walls.
- The east-west axis of the building is within 15 degrees of due east-west.
- The roof has a minimum of 450 square feet of south-facing area that is oriented appropriately for solar applications.
- At least 90% of the glazing on the south-facing wall is completely shaded (using shading, overhangs, etc.) at noon on June 21 and unshaded at noon on December 21.