ASHRAE 55, patient rooms, and metabolic ratesHealthcare-v4 EQc5: Thermal comfortposted by Jim Nicolow on Aug 6, 2021, 10:17 pm
Our HVAC engineer indicated that ASHRAE 55 cannot be met on a healthcare project because it is not applicable for metabolic rates below 1.0. Isolation room and ICU patients could be sleeping... |
|
Source for Table 1 Maximum ParametersLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by indian tantrik on Aug 16, 2021, 9:46 am
Source for Table 1 Maximum Parameters |
|
Grass area may become a future parking lot.NC-v4.1 WEp1: Outdoor water use reductionposted by Don Wheeler on Aug 16, 2021, 2:20 pm
When determining baseline calculations, I know not to include any aggregate areas. But if an area is initially grass with either temporary or permanent irrigation, should it be counted at all if... |
|
ENERGY STAR Appliances & Equipment Required for Federal ProjectCI-v4 EAp2: Minimum Energy Performanceposted by David Hryvniak on Aug 16, 2021, 2:47 pm
We are working on a project that is owned by the Federal Government. By law, all newly purchased equipment that is eligible must be ENERGY STAR certified. We would like to know if we can... |
|
Photocatalytic Exterior FinishesNC-v4.1 INc1: Innovationposted by David Shaw on Aug 17, 2021, 6:13 pm
Does anyone know of a pathway for credit for an exterior cladding with a photocatalytic finish in the Innovation Category? Thanks, |
|
Credit compliance for exceeded concentration levels?NC-v4 WEc3: Cooling tower water useposted by Lisa Denlinger on Aug 25, 2021, 2:05 am
We recently received City water test results that indicated the Chloride concentrations were 350 ppm. Are there any mitigation strategies we could employee to reduce the concentration levels in... |
|
Natural ventilation with exhaust fan for dormitory corridorNC-v4 EQp1: Minimum indoor air quality performanceposted by Yuxiang Zhao on Aug 25, 2021, 10:55 pm
Hi, We are now doing a school dormitory project. The owner do not intend to design mechanical ventialtion system (with piping system) for the corridors. The corridors connects occupiable... |
|
Is utilizing aerobic processor equipment an acceptable strategy for this credit?Pilot-Credits SSpc129: Comprehensive Compostingposted by Annalise Dum on Aug 30, 2021, 2:18 pm
Our project is considering utilizing kitchen equipment that uses aerobic processing to break down food waste into liquid that is then discharged via the plumbing onsite. If this is the only food... |
|
No Cooling Tower in LEED v2009 SchoolPilot-Credits WEpc94: No Cooling Towerposted by Sandra Schmid on Aug 31, 2021, 5:44 am
We are working on a LEED v2009 school project in Germany which is equipped with VRV refrigerating outdoor units for cooling of some rooms so there is no cooling tower, no use of latent heat of... |
|
Is there a benefit/penalty with regard to points earned by using this method compared to a 2010 PRM comparison?Pilot-Credits EApc111: Alternative Performance Rating Methodposted by Eric Dixon on Sep 2, 2021, 10:49 am
Has anyone found that they earned more or less points by using the 2016 PRM comparison rather than a 2010 PRM comparison? Is there any research or reference that I can show my client that they... |