Log in
Forum
Topic

Green Cleaning in a Semiconductor Fab???

EBOM-2009 IEQc3.1: Green cleaning - high performance green cleaning program
posted by David Gibney on Jul 16, 2015, 5:40 pm

I posed this question for a NC-2009 project a week ago and received no replies, so thought I'd re-post it here:
I'm working on a semiconductor fab that is part of a LEED campus project. The...

Last reply: David Gibney, Nov 3, 2015, 5:35 pm

New to LEED-ND...submitting for certification

ND-v2009 PIf1: Development Program and Site Type
posted by Courtney Royal on Jul 22, 2015, 2:08 pm

Hello,

My first question is, if Stage 3 is the only stage in the process that will garner an actual certification level for the development, then what are the benefits of also registering...

Last reply: Gwen Corrie, Aug 3, 2016, 10:52 am

How to document a non-LEED-certifiable building?

NC-2009 EAp2: Minimum Energy Performance
posted by Anya Fiechtl on Aug 3, 2015, 5:44 pm

Our project includes a separate non-LEED certifiable building with no regularly occupied space and no...

Last reply: Marcus Sheffer, Aug 7, 2015, 9:11 am

How to Get this credit For VRF System

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by SAMY Chamy on Aug 31, 2015, 4:24 am

Hai:-

Our project is sewing factory we already provide entryway mate and Exhaust as required, VRF system is used for A/c

1.Is it enough to attend this credit

2. Is...

Last reply: Dave Hubka, May 10, 2018, 8:14 am

Exhaust system tests

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Agnieszka Rylska on Oct 28, 2015, 5:43 am

I have two questions regarding exhaust system tests:
1. Do the tests have to be conducted only for local exhaust fans (like e.g. toilets and kitchens) or do we have to conduct tests also...

Last reply: Dave Hubka, May 24, 2016, 4:30 pm

energy modeling

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Bethany Beers on Dec 18, 2015, 9:43 pm

We have a tenant fit out of a single floor in an 8 story building. The new design is an energy efficient chilled beam system, and the central plant remains unchanged. Do I need to include the...

Last reply: Marcus Sheffer, Aug 9, 2016, 10:21 am

LEED Online terminology

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Susannah Goddard on Dec 21, 2015, 6:50 am

Possibly a bit of a rookie question but...

The scorecard page has a drop down which denotes the status of the credit. I am struggling to work out the terminology in some instances- for...

Last reply: Omar Elrawy, Dec 22, 2015, 7:19 am

Single Building Certification_LEED New Construction 2009

NC-2009 MPR2: Must be a complete, permanent building or space
posted by Aswin M on Dec 23, 2015, 5:42 am

We have a Garment factory project that has three blocks with connectivity bridge.
 The three blocks are namely Cutting block, Sewing block, and Fabric store block. The...

Last reply: Jon Clifford, Dec 30, 2015, 12:06 am

Baseline hot water generation

NC-2009 EAp2: Minimum Energy Performance
posted by Ciaran McCabe on Mar 2, 2016, 6:48 am

The Design Preliminary Review has been completed on one of my projects and we have one query from EAp2 which appears unclear. It states that ‘heating equipment should be heat pumps in both...

Last reply: Eva Denton, Jan 9, 2020, 6:10 am

PIf3- Space Usage "Calculator"- where to download

NC-2009 PIf3: Occupant and Usage Data
posted by Timothy Schmitt on Mar 7, 2016, 5:00 pm

Maybe a stupid question, but the v6 form under 2009 no longer has the table to fill in the space usage and instead says to upload the 'space usage calculator' available for download from the...

Last reply: Deborah Lucking, Oct 11, 2022, 7:01 pm