Topic | Recent |
---|---|
Value input for "Minimum required outside air flow,CFM"EBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Yong Lee Low on Jul 23, 2010, 3:58 am
In this pre-requisite we are following 'Option A' and filling in details in the 2007UM_62MZ Calculator. Further,filling in the online template column 3 in Table 1.1 requires "Minimum... Last reply: Jenny Carney, Sep 28, 2010, 10:12 pm |
|
EP CreditEBOM-2009 MRc8: Solid waste management - durable goodsposted by Walker Burttschell on Sep 27, 2010, 2:04 pm
According to the 2009 reference guide an exemplary performance point is not available for MRc8 (pg. 314). However, the actual credit template allows you to mark it for the extra point. And... Last reply: Tristan Roberts, Sep 28, 2010, 10:05 pm |
|
IESNA RP-33CS-2009 SSc8: Light Pollution Reductionposted by Julie Hendricks on Sep 28, 2010, 4:37 pm
On first submittal of this credit, we got the comment that our project was actually in an LZ-2 zone instead of an LZ-3 zone. We've always decided which zone our project is in based on the... |
|
Table Flush Fixture Data and Flow Fixture DataNC-2009 WEp1: Water Use Reductionposted by Rob Hink on Aug 30, 2010, 2:36 pm
Under the Fixture Group Column; What goes is supposed to be typed in the 'Select' Column? Last reply: Erica Downs, Sep 28, 2010, 2:30 pm |
|
Transfer data to LEED online?Schools-2009 MRc1.1: Building reuse - maintain existing walls, floors and roofposted by Nicole Cavanaugh on Sep 28, 2010, 10:28 am
How do we go about transferring the data from the provided LEED template to the online form? (Assuming there is an easier way than re-entering all the info? ) Thanks for your help! Last reply: Tristan Roberts, Sep 28, 2010, 10:56 am |
|
How do you calculate Transient visitors?CS-2009 WEc3: Water Use Reductionposted by Kathy Caswell on Sep 28, 2010, 7:58 am
I can not figure out how to calculate this for a core and shell office building that is 3/4 leased. Last reply: Tristan Roberts, Sep 28, 2010, 8:25 am |
|
Interior lighting for residential projectNC-2009 SSc8: Light Pollution Reductionposted by Deborah Spira on Sep 28, 2010, 8:22 am
Hi all, I am working on a residential multi-dwelling building. For a residential building it is impossible to control or decide the interior lighting for the apartments. Is this credit therefore... |
|
Runoff volumesNC-2009 SSc6.1: Stormwater design - quantity controlposted by Gregory Hurst on Sep 21, 2009, 6:50 pm
The key for volume calculation is knowing the 1 and 2-year, 24 hour storm depth. This is calculated fordifferent locations and it is a long process and it is not the same as calculating runoff... Last reply: Jean Marais, Sep 28, 2010, 2:53 am |
|
Packaged terminal heat pumpsNC-2009 EAc1: Optimize Energy Performanceposted by V. Miller on Sep 23, 2010, 3:45 am
Does anybody know why the baseline COP's for Packaged Terminal HVAC equipment (HVAC systems 1-2 for residential) are less for larger capacities and lower for smaller capacities i.e. Using the... Last reply: Michael Tillou, Sep 27, 2010, 10:28 pm |
|
Heat Recovery in Baseline ModelNC-2009 EAc1: Optimize Energy Performanceposted by V. Miller on Sep 23, 2010, 6:18 am
Does anyone know what the official line is on baseline heat recovery is for constant volume HVAC systems with more than 5000cfm? ASHRAE 90.1 G3.1.2.10 Exhaust Air Energy Recovery states... Last reply: Michael Tillou, Sep 27, 2010, 10:12 pm |