I am working on a v3 NC project being built on a site with an abundance of native vegetation. As a result of the presence of all the vegetation we are trying to preserve, we have to move our staging area to a not-so-grassy spot away from the building on the other side of existing parking for an existing building on the site. This land is being disturbed for the sole purpose of this project but it is non-contiguous, and we don't satisfy (a) through (f) on the non-contiguos allowance. I want to make sure that it is not to be included in the LEED Boundary based on MPR 3. Any thoughts?