Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Capitol Cost ECMs

EBOM-2009 EAc2.2:Existing Building Commissioning—Implementation
posted by  Robert Calloway  on 

When submitting the reports for a LEED RCx project, one of the reports is for Capital Cost Energy Conservation Measures.

2
Wed Apr 10, 2013, 6:53 pm

Leed Rating system - multiple buildings

LEED Rating System Selection
posted by  Kevin Perry  on 

Hello, We are working on a project for a privately funded college on a single site, in existing multiple buildings.

2
Principal
Integrated Design 360 LLC
LEEDuser Basic Member
0 thumbs up
Wed Apr 10, 2013, 4:02 pm

Calibration report

EBOM-2009 WEc1:Water Performance Measurement
posted by  Patricia Fuertes  on 

We are pursuing this credit but meters in Spain are not calibrated nevermore once they are installed. When they are revised they are substituted if needed or every 4 years for example.

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Wed Apr 10, 2013, 3:58 pm

Materials and Resource Calculator

NC-2009 MRc7:Certified Wood
posted by  Emmanuel Pauwels  on 

When trying to complete the Template, it says "Download, complete and upload the Materials and Resource Calculator (found under "Credit Resources") to document sustainable criteria values for MR Cr

7
Wed Apr 10, 2013, 3:28 am

Overground parking structure

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Maya Karkour  on 

Hello, I am working on a project (very big retail rectangular mall) which has an overground parking building (4 stories above ground) attached to it from one side.

2
Tue Apr 9, 2013, 3:55 pm

Underground Parking - Site Size

CS-2009 SSc7.1:Heat Island Effect—Nonroof
posted by  PAULA HIDALGO  on 

What happens if I have a building whose footprint is considerably smaller in comparison to the site size and I have 100% of the parking sites underground, can I achieve the credit no matter the SRI

3
Tue Apr 9, 2013, 2:37 pm

Contract between Owner and CxA for EAc3 Form in leedonline

CS-2009 EAc3:Enhanced Commissioning
posted by  Ron Dean  on 

From the EAc3 form: ''Provide the contract between owner and CxA ensuring CxA involvement post-construction. Financial information may be redacted/omitted''.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Apr 9, 2013, 2:10 pm

Esterified Pine Oil

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Maria Porter  on 

What do I compare esterified pine oil with? It doesn’t fit anywhere. It is a type of oil that normally is used on wood floors that are subject to high traffic.

2
Tue Apr 9, 2013, 7:19 am

Change in lighting schedules due to increased daylighting.

NC-2009 EAp2:Minimum Energy Performance
posted by  Zonda E. Team  on 

Dear community, we are doing a 90.1 App. G simulation for an existing manufacturing warehouse renovation + office building addition.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Apr 8, 2013, 9:19 pm

VAV Systems

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  David Hubka  on 

When demonstrating ASHRAE 62.1 compliance for VAV systems, what is the best approach to simulate worst case system conditions expected during normal ventilation operations?

8
Sustainability Manager
University California Davis
LEEDuser Basic Member
3 thumbs up
Mon Apr 8, 2013, 8:25 pm