Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Status of corridors/hallways for IEQp1

General forums
posted by  Wolfgang Werner  on 

I'm a bit confused about whether corridors/hallways are in or out?

5
Fri Apr 19, 2013, 12:43 am

Laundry detergent

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  Patty Breech  on 

How does laundry detergent fit into this credit, if at all? If we should include it, how do we show that it's sustainable?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Apr 18, 2013, 11:21 pm

Changing project name

General forums
posted by  Shivani Langer  on 

Our project hasn't gone through any precertifications yet. The project was registered in one name but now the name has changed.

2
Thu Apr 18, 2013, 8:45 pm

Recycled Content & FSC Certified Wood Credits Grey Area

NC-2009 MRc7:Certified Wood
posted by  Roberto Meza  on 

We have the following case: We bought several door with the following characteristics according to the cut sheet: FSC Mixed 70% (new wood) and 85% pre-consumer recycled content. How do we documen

11
Thu Apr 18, 2013, 5:42 pm

One stop with 6 different rutes - Expemplary Performance

CS-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Gabriela Hernández Castillo  on 

Our project is located on a heavily dense area and in one of the major streets. There is two bus stops that are within the .25 radius, but both bus stops are served by the same rutes.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Thu Apr 18, 2013, 5:07 pm

Able to use a calculator other than USGBC's?

NC-2009 MRc4:Recycled Content
posted by  Andrew Tse  on 

Does GBCI now require sole use of USGBC's calculator for MRc3-7? Or is it allowing use of 3rd-party calculators such as from LEEDuser or GCs?

4
Thu Apr 18, 2013, 3:32 pm

Design Appeal - PI Forms

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Erika Duran  on 

I am submitting an appeal for IEQp1 and uploaded new Mechanical Schedules to the PIf4 form to demonstrate that the inconsistencies that were present were due to a design change.

4
Default Avatar
Dr.
Sustainability & Green Building Consultant
LEEDuser Basic Member
7 thumbs up
Thu Apr 18, 2013, 1:01 pm

Registered LEED project on Hold?

NC-2009 PIf2:Project Summary Details
posted by  Hugh Hagues  on 

Hi, my LEED project is registered and I understand I have a time limit to complete my LEED documentation & projects.

2
Thu Apr 18, 2013, 12:20 pm

Semiheated Walls

NC-2009 EAp2:Minimum Energy Performance
posted by  Jean Marais  on 

I've interpreted the semiheated column in table 5.5-1 refering to the external walls of a semiheated space...as this table is much conserned with the envelope (the partition between the semiheated

5
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Thu Apr 18, 2013, 11:23 am

Mechanical room covered by greenroof

CS-2009 SSc7.2:Heat Island Effect—Roof
posted by  Michael E. Edmonds-Bauer  on 

By definition the mechanical room will be excluded from roof calculations. However, we are considering covering a mechanical room with a greenroof in order to apply for this credit.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Apr 17, 2013, 9:54 pm