Status of corridors/hallways for IEQp1
posted by Wolfgang Werner on
I'm a bit confused about whether corridors/hallways are in or out?
Laundry detergent
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Patty Breech on
How does laundry detergent fit into this credit, if at all? If we should include it, how do we show that it's sustainable?
Changing project name
posted by Shivani Langer on
Our project hasn't gone through any precertifications yet. The project was registered in one name but now the name has changed.
Recycled Content & FSC Certified Wood Credits Grey Area
NC-2009 MRc7:Certified Woodposted by Roberto Meza on
We have the following case: We bought several door with the following characteristics according to the cut sheet: FSC Mixed 70% (new wood) and 85% pre-consumer recycled content. How do we documen
One stop with 6 different rutes - Expemplary Performance
CS-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Gabriela Hernández Castillo on
Our project is located on a heavily dense area and in one of the major streets. There is two bus stops that are within the .25 radius, but both bus stops are served by the same rutes.
Able to use a calculator other than USGBC's?
NC-2009 MRc4:Recycled Contentposted by Andrew Tse on
Does GBCI now require sole use of USGBC's calculator for MRc3-7? Or is it allowing use of 3rd-party calculators such as from LEEDuser or GCs?
Design Appeal - PI Forms
posted by Erika Duran on
I am submitting an appeal for IEQp1 and uploaded new Mechanical Schedules to the PIf4 form to demonstrate that the inconsistencies that were present were due to a design change.
Registered LEED project on Hold?
NC-2009 PIf2:Project Summary Detailsposted by Hugh Hagues on
Hi, my LEED project is registered and I understand I have a time limit to complete my LEED documentation & projects.
Semiheated Walls
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
I've interpreted the semiheated column in table 5.5-1 refering to the external walls of a semiheated space...as this table is much conserned with the envelope (the partition between the semiheated
Mechanical room covered by greenroof
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Michael E. Edmonds-Bauer on
By definition the mechanical room will be excluded from roof calculations. However, we are considering covering a mechanical room with a greenroof in order to apply for this credit.