Log in
Forum
Topic

Commercial office refurbishment: which rating system?

LEED Rating System Selection
posted by Ricardo Sá on Apr 26, 2018, 8:23 pm

One of our clients is starting a major refurbishment of an office building. Main characteristics of this operation are:

  1. Building Owner: the client itself;
  2. Building...

Option 2- Strategy H

NC-v4 EQc6: Interior lighting
posted by Kaitlin Beeman on Apr 27, 2018, 11:31 am

Hello,

I have a few regularly occupied lab spaces with suspended lights at around 12'-8".  There is no ceiling in the space and the...

How do I update 62MZCalc spreadsheet to represent a fan powered VAV terminal unit

CI-2009 IEQc2: Increased Ventilation
posted by Jordan Kirrane on Apr 27, 2018, 12:20 pm

Hello,

A former colleague has submitted 62MZCalc spreadsheets to show compliance with the IEQc2 additional ventilation credit. We have had to following comment back from the an assessor...

Floor area Ratio (FAR) calculation for Zero Lot Line Projects

NC-v4 SSc4: Rainwater management
posted by Andrea Costa on Apr 30, 2018, 6:04 am

Dear all,

Please, could someone explain me in further detail how to proceed with the...

Enhanced strategies: CO2 monitoring for spaces served with ERU & 100% OA

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Sue Bryant on Apr 30, 2018, 6:14 pm

For this option, all densely occupied spaces have to have CO2 monitoring that is tied into the central BAS. Is there an...

Furniture refurbishment- 30%

CI-v4 MRc2: Interiors life-cycle impact reduction
posted by Kriss Kokoefer on Apr 30, 2018, 6:18 pm

How do I find out if any certified companies have received a point for refurbished furniture?  The point is awarded if 30% of the furniture or furnishings are refurbished, reused or salvaged.  I...

Pilot Closing 5/15/2018, New Credit Available

Pilot-Credits EQpc68: Indoor air quality procedure
posted by Batya Metalitz on May 1, 2018, 11:52 am

Pilot Credit 68 will be closing on May 15, 2018. A new pilot, <a href="https://www.usgbc.org/node/11656219">Pilot Credit 124: Performance-...

D & C Team perform Commissioning, CxA only Verifies?

NC-2009 EAc3: Enhanced Commissioning
posted by Adrian Arenas on May 2, 2018, 11:13 am

Our project is pursuing Enhanced...

Compliant laboratory and medical equipment

NC-v4 WEc2: Indoor water use reduction
posted by LEED Pro Consultant on May 2, 2018, 2:19 pm

For equipment such as steam sterilizer and sterile process washer, the requirement mentions liters/DIN tray, does the tray has to be any specific measure?

default visitor count for retail projects

Retail-NC-v4 LTc6: Bicycle facilities
posted by Gail Napell on May 3, 2018, 7:18 pm

we're doing a C+S with a retail lease space.  How do we determine the retail visitor count for this credit, WE, etc.?  i thought i saw this in v2009 but now i can't find it - can someone point us...