Topic | Recent |
---|---|
DHW limitationsNC-2009 EAp2: Minimum Energy Performanceposted by Jorge Lopez de Obeso on Jan 16, 2019, 1:25 pm
Hi, I've been having some trouble regarding... Last reply: Jorge Lopez de Obeso, Jan 22, 2019, 5:01 pm |
|
CDWM Plan Sample or Template.NC-v4 MRp2: Construction and demolition waste management planningposted by Olga Yuil on Jan 16, 2019, 4:28 pm
Is there a template or sample for the construction and demolition waste management plan itself? Last reply: Olga Yuil, Mar 6, 2019, 3:28 pm |
|
Substituting v4 with a v4.1 compliant approachCI-v4 EQc2: Low-emitting materialsposted by Stacey Olson on Feb 1, 2019, 1:46 pm
Is it possible to provide documentation in line with the v4.1 requirements for a LEEDv4 regsitered project? We're looking specifically at the Low Emitting Materials strategy, which is the same... Last reply: DuWayne Baird, Apr 24, 2019, 8:45 pm |
|
Institute of Transportation Engineers’ Transportation Planning HandbookSchools-NC-v4 LTc7: Reduced parking footprintposted by Kate Bubriski on Feb 4, 2019, 12:47 pm
Does anyone know if the table in the 4th edition, which LEED v4.1 references, is different than the 3rd edition? Last reply: Emily Purcell, Sep 17, 2019, 6:07 pm |
|
Process energy complianceNC-v4 EAp2: Minimum Energy Performanceposted by Luis Andrade on Feb 25, 2019, 6:42 am
Helo al! We are evaluating the LEED certification potential of a new winery that will be built in Portugal (using the rating system LEED BD+C v4: New Construction and Major Renovation).... Last reply: Marcus Sheffer, Mar 4, 2019, 5:02 pm |
|
Gender Neutral Restrooms and Commercial Food Service SinksNC-v4 WEp2: Indoor water use reductionposted by Michael Kelly on Mar 7, 2019, 12:21 pm
I'm trying to fill out the water reduction calc but I'm not sure how to account for GN restrooms and commercial kitchen sinks. This project has core restrooms with toilets and urinals. However... Last reply: emily reese moody, Apr 9, 2021, 2:24 am |
|
Ventilation of parking garagesCS-v4 EAp2: Minimum Energy Performanceposted by Sarah Leenknegt on Mar 11, 2019, 7:51 am
Hi We are modelling an office building in Switzerland with LEED v4 Core and Shell and have a question regarding the required ventilation rate for parking garages. According to ASHRAE 62.1... Last reply: Tyler Thumma, Aug 21, 2020, 11:38 am |
|
"Pilot-Credits SSpc83: Offsite Financial Support for Habitat Protection"NC-v4 SSc2: Site development - protect or restore habitatposted by Yoyo Shek on Mar 14, 2019, 6:30 amTrista Brown Project Director WSP USA LEEDuser Basic Member 456 thumbs up April 11, 2019- 8:44 pm Hi Yoyo, yes you can replace the normal SSc2 Site Development credit with Pilot Credit 83. This webpage: https://www.usgbc.org/node/5052535?return=/pilotcredits/New-Construction/v4 confirms PC83 is applicable for BDC v4 projects. And there's no distance requirement for the pilot credit, but as you point out, you have to donate to NFWF or FAS. Remember to also register for the Pilot Credit and complete all the requirements (e.g. the feedback survey and participate in the LEEDuser credit forum... Last reply: Trista Brown, Mar 5, 2021, 2:11 pm |
|
Option 2 Diverse Uses- how many uses can be in a one buildingNC-v4 LTc4: Surrounding density and diverse usesposted by Jeff Sexton on Mar 28, 2019, 3:17 pm
There is an existing hospital within 1/2 mile... Last reply: Deborah Lucking, Apr 28, 2021, 6:13 pm |
|
Average flow rateNC-v4 WEc2: Indoor water use reductionposted by Gustavo De las Heras Izquierdo on Apr 4, 2019, 12:23 pm
Hallo, In the last version of the indoor water use calculator, which can be downloaded here: Last reply: Maria Porter, Oct 22, 2019, 9:32 am |