Energy modeling - Adjacente building

NC-2009 EAp2:Minimum Energy Performance
posted by  Luana Bertoletti  on 

Hi, I have a doubt when modeling proposed and baseline building.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Sep 10, 2013, 6:47 pm

Need For Automated Shades

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Brandon Scales  on 

I am currently working on a school project using option 2 on the IEQ 8.1 form. Many of the rooms have a VLTxWFR ratio that exceeds 1.8.

5
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Tue Sep 10, 2013, 6:38 pm

Construction EQ Management Plan

Healthcare-v2009 IEQc3.1:Construction IAQ management plan - during construction
posted by  Todd Bundren  on 

The requirements for the EQ Management Plan in the LEED for Healthcare 2009 seems to be different from the NC 2009 requirements. Does anyone have an example of this plan?

6
LEED Green Associate
GGO Architects
LEEDuser Basic Member
1 thumbs up
Tue Sep 10, 2013, 5:40 pm

Natural Conditioned Environment

NC-2009 EAp2:Minimum Energy Performance
posted by  Marina Andrade  on 

Hi! how can I prove that an environment is naturally conditioning? I believe this is not only proven by percentage of openings, correct? For example, how to prove this in a restaurant?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Sep 10, 2013, 4:03 pm

Daylight Sensors

CS-2009 EAc1:Optimize Energy Performance
posted by  Jorge Lopez de Obeso  on 

Does anyone know if it is possible to document energy savings on a Core & Shell project by installing daylight sensors in spaces and use the leasing agreement to enforce the connection of the i

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Sep 10, 2013, 2:49 pm

Baseline System 1 Pump Energy

NC-2009 EAp2:Minimum Energy Performance
posted by  Wes Lawson  on 

We are putting together a baseline of a high rise residential building. In Appendix G, it states that we need to use 19 w/gpm.

9
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Sep 10, 2013, 2:00 pm

Advanced Building Core Performance Guide - Square Feet

CS-2009 EAp2:Minimum Energy Performance
posted by  LORENZO ORSENIGO  on 

Hello, we are working on a project of approximately 100,000 square feet. The property doesn't want to implement the energy modeling due to economic issues.

3
Tue Sep 10, 2013, 1:46 pm

Occupancy canteen/lobbies

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Jean-Baptiste Noel  on 

For our project, the canteen was designed with an area that would give an occupancy of 1400 people if we were to follow the default ASHRAE 62.1 occupancy, which is very high given the fact that abo

9
Tue Sep 10, 2013, 10:49 am

Dishwashers - Water Consomption

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Ralf Lehmann  on 

Besides the energy requirement for ES requirements are also made on the consumption of water (Standard Sized Models: equal or less 4.25 gpc). For a European project I want to show equivalency for a

5
Default Avatar
LEEDuser Basic Member
45 thumbs up
Tue Sep 10, 2013, 5:57 am
2
Mon Sep 9, 2013, 9:15 pm