SSc1: Previously Certified Projects
posted by Peter Locke on
It seems that the only way a previously certified LEED EB project can obtain these 4 points is if the project has "maintained tracking" since completeing the initial certification (see guidance on
Threat factor calculation for operable shutters
Pilot-Credits SSpc55:Bird collision deterrenceposted by Jessica Wuest on
Hi, I was wondering how to calculate operable shutters that cover clear glass.
Floor Leveling Product
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Catherine Blakemore on
Does a floor leveling product get listed as a floor coating?
Ingress and egress
ND-v2009 NPDp3:Connected and open communityposted by Colin Day on
Hi Eliot, Our project has two vehicle entries on its north side.
Basleine Fan Power credit for an exhaust fan linked to Furnace
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
I have an attic that is heated only with a Gas Furnace.
Ozonation for Lift Lobby Area
CS-2009 IEQp1:Minimum IAQ Performanceposted by Poorva Keskar on
The consultant has proposed an Ozonation System (IAQ Management System) for Lift Lobby area.
Return Fan included in Baseline Fan Power Calc?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
Another question regarding the baseline fan power calculation in the Tables 1.4 Excel spreadsheet: Does the calculation account for the possibility of a Return Fan in the proposed system?
Energy modeling - Adjacente building
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I have a doubt when modeling proposed and baseline building.
Need For Automated Shades
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Brandon Scales on
I am currently working on a school project using option 2 on the IEQ 8.1 form. Many of the rooms have a VLTxWFR ratio that exceeds 1.8.