Vending Machine Rated Power
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Lara Schneider on
Does anyone know what the rated power is for vending machines?
A/V Equipment
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Jennifer Preston on
We are compiling the equipment for a multi-floor office renovation. Dow e need to include A/V Equipment? Including ceiling speakers, projectors, projection screens, microphones, etc?
SSc1: Previously Certified Projects
posted by Peter Locke on
It seems that the only way a previously certified LEED EB project can obtain these 4 points is if the project has "maintained tracking" since completeing the initial certification (see guidance on
Threat factor calculation for operable shutters
Pilot-Credits SSpc55:Bird collision deterrenceposted by Jessica Wuest on
Hi, I was wondering how to calculate operable shutters that cover clear glass.
Floor Leveling Product
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Catherine Blakemore on
Does a floor leveling product get listed as a floor coating?
Ingress and egress
ND-v2009 NPDp3:Connected and open communityposted by Colin Day on
Hi Eliot, Our project has two vehicle entries on its north side.
Basleine Fan Power credit for an exhaust fan linked to Furnace
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
I have an attic that is heated only with a Gas Furnace.
Ozonation for Lift Lobby Area
CS-2009 IEQp1:Minimum IAQ Performanceposted by Poorva Keskar on
The consultant has proposed an Ozonation System (IAQ Management System) for Lift Lobby area.
Return Fan included in Baseline Fan Power Calc?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
Another question regarding the baseline fan power calculation in the Tables 1.4 Excel spreadsheet: Does the calculation account for the possibility of a Return Fan in the proposed system?