Log in
Forum
Topic

FSC and Onsite Harvested Wood

NC-2009 MRc7: Certified Wood
posted by Lee Dingemans on Jun 3, 2010, 9:03 am

...

Last reply: Jennifer Frey, Mar 7, 2011, 9:20 pm

Garbage disposals with on-site wastewater treatment?

Schools-2009 WEc4: Process water use reduction
posted by Anya Fiechtl on Mar 7, 2011, 2:18 pm

The intent for this credit is "To maximize water efficiency within buildings to reduce the burden on municipal water supply and wastewater systems."

The principal at our school was not...

Last reply: Suzanne Painter-Supplee, LEED AP+ID&C, Mar 7, 2011, 7:48 pm

Limiting access once the building is enclosed

NC-2009 IEQc3.1: Construction IAQ management plan - during construction
posted by Vanessa Seibert on Mar 7, 2011, 12:32 pm

Our experience on projects is that limiting the access to one door with a long, regularly cleaned carpet, is expected by the LEED reviewer. We are currently working on a three story building and...

Last reply: Vanessa Seibert, Mar 7, 2011, 5:52 pm

DSIRE...

General forums
posted by Tristan Roberts on Mar 7, 2011, 4:34 pm

DSIRE is the best nationwide resource on incentives like this. I would start there.

Exhausted heat

NC-2009 EAc1: Optimize Energy Performance
posted by Kath Williams on Mar 3, 2011, 12:42 pm

Can a LEED project use exhausted/waste heat (and claim credit of some kind) from an adjacent building that is not being included in LEED project boundary?

Last reply: Marcus Sheffer, Mar 7, 2011, 4:33 pm

SLL Prereq 1

General forums
posted by Peter Doo on Feb 26, 2011, 8:56 pm

I'm working on a predeveloped 95 acre site at the end of a peninsula. One drives through and existing residential neighborhood that does not have many diverse uses. The existing site was a...

Last reply: Ted Bardacke, Mar 7, 2011, 2:57 pm

Systems Furniture Panel Fabric

CI-2009 IEQc4.5: Low-emitting materials - systems furniture and seating
posted by Lori Selcer on Feb 21, 2011, 7:14 pm

We have specified panel sysems for our project which are Greenguard certified. However we are using COM fabric for the panels, that is, we are using fabric from another manufacturer. While the...

Last reply: Randal Carter, Mar 5, 2011, 8:54 am

Savings calculations

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Sundararaj Subburaman on Feb 9, 2011, 2:04 am

Our client is occupying the 8th floor of a G+8 building. The central plant is a combination of Air cooled and water cooled chillers. The conditioned area of the project area alone is 45,000 sqft...

Last reply: Sundararaj Subburaman, Mar 4, 2011, 11:57 pm

Existing bus stop

NC-2009 SSc4.1: Alternative transportation - public transportation access
posted by lance mccardle on Mar 3, 2011, 4:46 pm

We are doing a major renovation on a multifamily housing complex that was built in 1990 with bike racks and a bus stop that the owners put in when the building was first constructed. The only...

Last reply: David Posada, Mar 4, 2011, 1:16 pm

LEED CI- Minimal TI for a Large Space = CI Cert?

LEED Rating System Selection
posted by Michelle Bracewell-Musson on Mar 4, 2011, 12:19 pm

CI requires a minimum 250 SF to be renovated. We meet that, however, the space is two floors totaling 50,000 SF and she only wants to modify 7,000 SF, and wants the whole two floors (50,000 SF)...

Last reply: David Posada, Mar 4, 2011, 1:01 pm