Forum quick links
Does CARB certification meet the Requirements?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Erika Duran on
I just had a manufacturer submit a CARB Phase 2 Certification for this credit for Par Ky flooring.
Project Boundary for LEED CI project
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Jerry Reeves on
My project is a renovation of one floor of a 4 story office building. The entire floor is leased by one tenant. No initial fit-out is in the scope of work. We are targeting LEED CI certification.
New vs. Existing
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Lara Schneider on
Where in the 2009 CI LEED reference guide does it state that only NEW Energy Star appliances are to be included in the calculations?
ASHRAE Standard 62.1–2010, Sections 4–7
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Jonathan Miller on
Can someone list the minimum requirements of ASHRAE Standard 62.1–2010, Sections 4–7? Thanks much.
Toilet Exhaust with Exhausted Air to Storage
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marina Andrade on
Hi, I'm working on a project for a deposit. On site there is a large exhaust fan on the roof.
Material Cost Calculation
NC-2009 MRc4:Recycled Contentposted by Loretta Maine on
I have a steel supplier who completed a very nice Material Reporting Form for me with a great breakdown of every one of the many products they provided for our project.
EPA Tools for Schools for IEQ c1.1
EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Programposted by Will Bianchi on
Our elementary school has adapted the EPA Tools for Schools Policy to address all components of indoor air quality. Tools for schools seems to cover the I-Beam criteria.
Brown Field redevelopement
NC-2009 SSc3:Brownfield Redevelopmentposted by Sahar Abi-Ziki on
Hello, Due to budget issues, our client wants to decontaminate a portion of the site and not the entire site (only the areas were we are doing interventions).
Submitting in excel format instead of filling out form
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Kathryn West on
Has anyone ever submitted an excel sheet for this credit in lieu of filling out the whole form.
Building Space Flushout
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Weld Morse on
I am working on a Massachusetts public works maintenance facility. it involves 2 separate structures; an office building and a garage.