Log in
Forum
Topic

JUST Certificate- Pilot Credit: Social Equity Within the Project Team

NC-v4 INc1: Innovation
posted by Alison Rosso on Aug 8, 2023, 7:39 pm

of the design team" of this Pilot credit and will submit our JUST label for a LEED v4 ID+C Project. The credit requires the following: 1. Pilot credit registration 2. LEEDuser forum participation 3. Pilot...

Last reply: Douglas Flandro, Mar 22, 2024, 10:31 am

Lighting Boundary Modification- Light Trespass: Option 1. BUG Rating Method Only?

NC-v4 SSc6: Light Pollution Reduction
posted by Lenka Matějíčková on Aug 30, 2023, 2:30 pm

The LEED manual states that, under certain conditions, the lighting boundary can be modified (e.g.when the property line is adjacent to a public street, alley, or transit corridor, the lighting...

Last reply: Glenn Heinmiller, Sep 12, 2023, 10:56 am

District heating prices

NC-v4 EAp2: Minimum Energy Performance
posted by Azra Semic on Sep 13, 2023, 5:59 am

Hello,
Does anyone know if we are able to deduct from energy prices (gas) if district heating is using only 50% of gas for heating and rest comes form renewable sources?
Thanks!

Last reply: Azra Semic, Oct 25, 2023, 9:10 am

VOC Compliance for Toilet pods manufactured offsite

NC-v4 EQc2: Low-emitting materials
posted by Alokmay Behera on Oct 4, 2023, 2:28 am

There is a mixed-type building targeting LEED Platinum based in UAE. The project will have all toilet pods constructed offsite. If we go by the LEED V4 reference guide, any offsite application...

Last reply: Alokmay Behera, Oct 9, 2023, 7:27 am

Reviewer requires cutsheets

NC-v4 EQc6: Interior lighting
posted by Edgar Arevalo on Oct 13, 2023, 1:58 pm

Ok so I get a comment from the LEED reviewer asking for cutsheets of the lighting fixtures to back up the strategies I'm pursuing for the Lighting Quality section of this credit.  I need to ask,...

Last reply: Umesh Atre, Oct 13, 2023, 5:21 pm

Two separate buildings / 2 waste haulers / 1 report

NC-v4 MRp2: Construction and demolition waste management planning
posted by Allison Para on Nov 1, 2023, 3:04 pm

Hello Users,

I have a question regarding 2 separate (identical) residential buildings, registered to LEED separately by architect (NCv4bdc), located a court yard across from one another,...

Last reply: Allison Para, Nov 9, 2023, 4:25 pm

ny exception for the minimum 5% energy cost saving before renewable energy

NC-v4 EAp2: Minimum Energy Performance
posted by Moses Chong on Jan 11, 2024, 1:56 pm

I have a project with 2 building in LEED V4. One building is saving 14% and one building is only saving 0.05%, overall saving is 10.6%. The building with 0.05% saving actually have...

Last reply: Michael Callan, Jan 12, 2024, 1:33 pm

Green Building Education- Is one large signage enough

NC-v4 INc1: Innovation
posted by Aishwarya Katta on Jan 29, 2024, 4:23 pm

We're considering installing a larger sign in the lobbies of two buildings in my campus project to meet the Green Education Credit Requirement. Does LEED accept having a large comprehensive...

Last reply: hassan izhar, Jan 30, 2024, 6:24 am

Modeling Proposed DHW with Insulation

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Jan 31, 2024, 2:07 pm

Hi I am Modeling a...

Last reply: Marcus Sheffer, Jan 31, 2024, 5:32 pm

What is an "Existing Buiding" for EB:OM?

EBOM-v4 MPR2: Must use reasonable LEED boundaries
posted by Davide Filippi on Feb 11, 2014, 6:13 am

An existing, old and close building (nobody insiede for years, no heating system working...) can pursue a LEED EB:OM v4 Existing building?

Last reply: Davide Filippi, Feb 11, 2014, 8:53 am