Log in
Forum
Topic

n/a

NC-2009 EAp2: Minimum Energy Performance
posted by Curtis Clark on Aug 20, 2015, 11:02 am

For Non-Residential fenestration system that are designed to be
field glazed or field assembled units for compliance with ASHRAE 90.1-2010, the supplier provides a certificate according to...

Last reply: Marcus Sheffer, Aug 25, 2015, 9:59 am

LEED NC or LEED for Healthcare?

LEED Rating System Selection
posted by Elisa Sirombo on Aug 21, 2015, 4:16 am

Dear All,
We are working on a project located in Italy, which would pursue the LEED certification under a 2009 version and we are wondering about the most appropriate rating system to use...

Last reply: Elisa Sirombo, Sep 4, 2015, 9:54 am

What "floor area" to use

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Lyle Axelarris on Aug 26, 2015, 9:10 pm

Since the credit template is not linked to the Gross Floor area in PIf2 (as it is in other relevant credits), does that mean the floor area in the flushout calcs should be net area, as it is done...

Last reply: Dave Hubka, Oct 8, 2015, 5:15 pm

Transit Service Tables

ND-v2009 PIf3: Project Location and Base Mapping
posted by Michael Smithing on Aug 28, 2015, 2:43 am

Where can I find the Transit Service Tables that are referred to on the form? It says they are in the Credit References, but they do not appear to be available in the credit library on the...

Last reply: Michael Smithing, Aug 31, 2015, 10:00 pm

SCS Global Certification

CI-2009 IEQc4.5: Low-emitting materials - systems furniture and seating
posted by Steve Valev on Aug 31, 2015, 2:54 pm

Most of the furniture selections in out project have a certification from SCS Global which is an ANSI Accredited Product Certification. Is this an acceptable substitute to Greenguard?

If...

Last reply: Michael Munn, May 14, 2019, 5:34 pm

Assembly U-value Calculation

NC-2009 EAp2: Minimum Energy Performance
posted by MURAT DOĞRU on Sep 4, 2015, 3:13 am

Dear all,
I’d like to ask a question about the...

Last reply: Jean Marais, Sep 7, 2015, 4:16 am

2 buildings but cannot function independently without the other

NC-2009 MPR2: Must be a complete, permanent building or space
posted by Miriam Ramirez Baumgarten on Sep 7, 2015, 6:37 pm

Hi,
We have a project that includes a Hangar, with two levels of administrative offices and workshop area in one 250,000sf building. Adjacent to the building (80ft away) and separated only...

Last reply: Miriam Ramirez Baumgarten, Aug 8, 2016, 2:28 pm

Definitions for areas excluded in calculations?

NC-v4 WEp1: Outdoor water use reduction
posted by Elizabeth Powers on Sep 10, 2015, 9:03 pm

Both WEp1 and WEc1 state: "The following landscape types may be included or excluded from landscape calculations: vegetated playgrounds, athletic fields, food gardens, and urban agricultural...

Last reply: Simon Nussstein, Jun 25, 2020, 2:46 am

Public Restrooms Definition (ASHRAE 90.1)

NC-2009 EAp2: Minimum Energy Performance
posted by André Harms on Sep 14, 2015, 7:35 am

I already did, it must not have recorded in the forum. Sounds to me like you will need to meet this mandatory provision and install mixing valves or lower the temperature at the source. Log in or register...

Last reply: Marcus Sheffer, Oct 1, 2015, 12:17 pm

How to count Individual Worksations

NC-2009 IEQc6.1: Controllability of systems - lighting
posted by SAMY Chamy on Sep 15, 2015, 3:44 am

Dears:-

we have open office with 20 Desk.in every desk three occupants are working.That three occupants do the same operations in 15 desks in remaining desks they do different activities...

Last reply: Lauren Sparandara, Feb 29, 2016, 12:21 am