High Recycled Content
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by barbara anderson on
In the past 6 months we have noticed that a high recycled content of 70% or more has been required on acoustic ceiling tile.
Naturally Ventilated
NC-2009 IEQp1:Minimum IAQ Performanceposted by Alejandro Macias on
Hi! I'm working on a one-story dormitory project.
Providing dedicated area for mercury-containing products?
Healthcare-v2009 MRp2:PBT source reduction - mercuryposted by Richard Barlow on
We are trying to respond to Prelim. Design review comments on a LEED-HC v2009 project for an Inpatient Hospice and Palliative Care facility.
Roof area covered 90% by equipment
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Ran Zhang on
Hi, I am working on a 10 floors office project building in Japan. For roof area, there are only about 100 sqm exposed surface (less than 10% of total area).
Commissioning building areas
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by gabriel Morales on
We have a process of commissioning CS 2009 , and we have a question: In the reference guide mentioned that 50,000 SF smaller projects the contractor could be the CxA , however the area of 50,00
Option B for a reception area in a massive office tower lobby
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Elliot Young on
So, back again to ask another one. We are ever so close to reaching 75% threshold and without having the engineers run daylight models or measure the space I'm trying to pick up any space we can.
PU Foam Insulation - Emission Test ISO16000-11
NC-v4 EQc2:Low emitting materialsposted by Jovelyn Lagunday on
General emissions requirements as per LEEDV4 - TVOC's result after 14 days but the information available in accordance with ISO1600 method, TVOC testing results after 28 days.
jet fans
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
Table 6.4 of ASHRAE 60.1-2010 states that parking garages that don't have walls that are at least 50% open to the outside shall have mechanical air extraction (exhaust ventilation).
ITE Parking Generation- multiple Average Peak Period Demand
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Takayuki Hirota on
We are working on a project that has no minimum local zoning requirements, and attempting to earn points through OPTION 4.
Cold rooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Jutta Berns on
Good morning, We have a project that has two cold rooms at -17 and 0 degrees Fahrenheit. These rooms are temporary storage locations of perishable product.