" no view down into", how to interpret this?
NC-v4 EQc6:Interior lightingposted by Qiang Zhang on
Interior Lighting question. Option 2. Lighting Quality (1 point) A.
Regular Bus Service to Light Rail Station
CS-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Deborah Lucking on
I can guess the answer to my question, but am hopeful to be proved wrong: our project is within the 1/4 walking distance to a bus stop with a single service.
Chilled Beam System Energy Modeling- CS v2009
CS-2009 EAp2:Minimum Energy Performanceposted by Shenhao Li on
Hello Everyone, I have an office project which is designed to use a little compicated HVAC system.
Leakage Rate in v5 Form
EBOM-2009 EAc5:Enhanced Refrigerant Managementposted by Andy Rhoades on
My understanding is that the minimum acceptable Leakage Rate is 0.5%, even if the actual data demonstrate a lower leakage rate.
Two story atrium - include 2nd floor in gross area calculations?
NC-2009 PIf4:Schedule and Overview Documentsposted by Anna Korinkova on
We have a project that has a two story atrium, running across the 1st and 2nd floor. Is the 2nd floor atrium (empty) space included in the gross area calculations or not?
Carrier air to water chiller (non standard (ARI) testing)
CS-2009 EAp2:Minimum Energy Performanceposted by David Lazaro on
I would like to check if the Carrier model 30RQ0262 (COPc=2,62 according ARHI test 550/590 despite ASHRAE requires ARI 340/360) will meet that Mandatory Provisions in terms of Equipment Efficiency.
Baseline HVAC System
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
We are using packaged VAV with reheat system 5 for the Baseline System.
Air - Water Heat Pumps
CS-2009 EAp2:Minimum Energy Performanceposted by Giuseppina Amorusi on
Hi all, I need to model in Energy Plus several "Air - Water Heat Pumps": heat pumps that use air as energy source and water as fluid for conditioning.
Option 2 Calculation Question
NC-2009 MRc5:Regional Materialsposted by Haley Duncan on
When calculating distances from location of extraction and location of manufacturing to project site, is it "as the crow flies" or actual travel distance?
Which credit does poured resinous flooring fall into?
Schools-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Kyle Strock on
We are using a resinous flooring system in some restrooms. It does not seem to meet the Green Seal definintion of "Coating" since it includes aggregate and color chips.