My understanding is that the minimum acceptable Leakage Rate is 0.5%, even if the actual data demonstrate a lower leakage rate. The v4 form accommodated this by allowing the Lr to be manually entered but the v5 form only auto-calculates the Lr based on the amount of refrigerant added. If I have units that have not had any refrigerant added within the past year, how can I use a leakage rate that LEED accepts while still reporting accurate data on refrigerant added? Has anyone else experienced this problem?