Forum quick links
Exterior LPD addendum i and 90.1-2010
CS-2009 EAp2:Minimum Energy Performanceposted by Martin K on
Hi, what surface type should be used for overhang construction if using Addendum i or 90.1-2010 version?
EAc5 Option 3
NC-2009 EAc5:Measurement and Verificationposted by Jeff Wiedmeyer on
I have a client who has chosen to meet MPR#6 by selecting Option 2: USGBC Approved Data Template.
porcelain flooring Tiles
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by soha yamani on
Does porcelain flooring Tiles lie under mineral based flooring category ? if not what would be its requirements to comply with IEQ Credit 4.3: Low-Emitting Materials Flooring Systems ?
Doing both the Level II assessment and credit EA2.3 "ongoing Cx"
EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioningposted by Tom Kennedy on
Our team sees benefit to doing both, and making a deliberate effort to place energy-items into either the "audit" or "Cx" category (so we don't duplicate too much).
Liability of the LEED Consultant
posted by Ayton Tan on
Hi, I have a question regarding the "Liability of the LEED Consultant": A contract has been signed between a LEED consultant and the client in order to obtain a LEED certification for the project.
Overlap between LEED v4 and WELL
posted by Nirwair Singh Bajwa on
Hi, I am working on a WELL project which has registered for LEED v4 ID+C.
Furniture & Furnishings in MR Credits
CI-2009 MRc4:Recycled Contentposted by Patty Lloyd on
In LEED v3 CI are furniture and furnishings budget still required to be included in the MR credits 4,5, & 6?
No 2-year, 24 hour design storm data available
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Mario S. on
The 2 year, 24-hour design storm precipitation data is unavailable for the country. However, Historic rainfall data exists.
cold, dark warehouses in v4
posted by Michelle Rosenberger on
The majority of our Core & Shell warehouse projects are cold, dark shells with no tenants. We do not see a path for these projects to achieve certification at all in LEED v4 C&S.
BPDO calculator and Furniture
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Michelle Rosenberger on
As I understand it, IDC projects are required to use Actual Materials cost and to include furniture in that cost.