Forum quick links
Providing carpool spaces within an unreserved parking garage
CI-v4 LTc5:Reduced parking footprintposted by Jennifer Rinkus on
Our project is a small tenant remodel in an urban building. There is no parking associated with the building or our clients lease.
Retaining old windows in a gut-rehab
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Jamison Hill on
My building has several windows that are less than 10 years old. They are in excellent shape.
what about tenant signage?
CS-v4 SSc6:Light pollution reductionposted by Jens Apel on
As far as I understand internally iluminated signage that is in the scope of future tenants and thus not in C&S scope is excluded, correct? So when tenants install signage on their own they can
Green Wizard = UL SPOT
posted by Michelle Bombeck on
hidden price on the invoice
CS-2009 MRc6:Certified Woodposted by Agnieszka Rylska on
In our case, the wooden walls are produced by a German manufacturer who is COC-certified.
Renewable Energy in CS project
CI-v4 EAc4:Renewable energy productionposted by Sara Johansson on
Is the tenant obliged to install additional renewable energy (or sign ownership/contract for off-site renewable energy) if the CS project fullfills criteria and recieves maximum (3) points?
Projects with little landscaped area (prescriptive only?)
Homes-v4 WEc1:Total water useposted by Tim Nabholz on
It seems that for projects with small amounts of landscape areas, which many Homes: Midrise projects would be, the performance path doesn't seem to make sense.
Parking spaces provided to project building in another garage
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Eleftherios Zacharakis on
Hi!
Phasing
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Scott Barber on
I have a couple of questions regarding a core&shell renovation project I'm working on: 1- When do the preferred parking spaces need to be reserved?
Fixtures outside the project scope
CI-v4 WEc1:Indoor water use reductionposted by Takayuki Hirota on
Our office project will occupy two floors of a newly constructed building and the building owner will provide all water fixtures including water closets, lavatory faucets and kitchen faucets.