Natural Roof Top Ventilator
NC-2009 IEQp1:Minimum IAQ Performanceposted by SAMY Chamy on
Dear Concern:- The proposed project consist of 200000 sq.ft area in a single space It is totally metal building the roof top have natural ventilators and the exterior wall have louvers in all sid
Points Earned for IAQ Test?
NC-v4 EQc4:Indoor air quality assessmentposted by Kimberly Schlaepfer on
I am wondering if anyone has successfully pursued the IAQ testing path for 2 points and/or if anyone has pursued the IAQ testing points and not been successful in earning the points. We are pursui
Environmental Product Declaration
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Gabriela Mena on
Hi, We are evaluating the EPD performance of a commercial interior project furniture, the architects are specifiyng Herman Miller Furniture and almost all have the BIFMA certification, I would li
Agricultural Contaminants in Soil
NC-v4 LTc3:High priority siteposted by Matthew Macko on
A campus project I am working on is located on a site where some agricultural contaminants were discovered in the soil.
Fresh air fan model
NC-2009 IEQp1:Minimum IAQ Performanceposted by Sivarajah Ragulakeethan on
Hi We are working on a Data center LEED project. Do we need to model the fresh air fan for server room area because there were already exhaust fan and fire suppression system?
Clarification MPR#2 - LEED NC 2009 v3 - Airport extension
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Wim Maassen on
How to set LEED Building boundary for new extension of an airport? In next phases other new extensions/will be added.
Brazilian Equivalent Standard
CS-2009 EAp2:Minimum Energy Performanceposted by Pamela Svetllana Santos Souza on
Hello, I'm modelling for LEED C&S 2009. The project has 26 floor type of mixed-use offices.
Diverse Uses - Document Nearby Uses
CS-v4 LTc4:Surrounding density and diverse usesposted by Maria Fiorelli on
Previously in v2009, to document 'Community Connectivity' we would use a radius around our project on Google Earth, marking the diverse uses with icons.
Sidewalk with landscaped area
ND-v2009 NPDp1:Walkable streetsposted by Noriko Nagazumi on
Hi, In our project, continuous sidewalks of 2.5m width are provided for all street within the project boundary, but a portion of one of the sidewalks is filled with shrabs and trees and people can
Recycled Water in Concrete and SCMs
CS-2009 MRc4:Recycled Contentposted by Ward Miller on
The Reference Guide language related to SCMs in concrete gives project teams the choice whether to include SCMs as a percentage of the entire concrete or separate them out (pg.