Hi
We are working on a Data center LEED project. Do we need to model the fresh air fan for server room area because there were already exhaust fan and fire suppression system? Please clarify of this issue.
Thank you,
Regards
Forum discussion
NC-2009 IEQp1: Minimum IAQ Performance
Hi
We are working on a Data center LEED project. Do we need to model the fresh air fan for server room area because there were already exhaust fan and fire suppression system? Please clarify of this issue.
Thank you,
Regards
LEEDuser is supported by our premium members, not by advertisers.
Go premium forTo post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.
Is outdoor air quality testing required in a space using natural ventilation?
What options are available to projects outside the US to meet this prerequisite?
Can LEED 2009 projects elect to follow ASHRAE 62.1-2010 for this prerequisite?
Which units should be included in the calculations for this prerequisite?
Dionisio Franca
DirectorWoonerf Inc.
30 thumbs up
June 14, 2017 - 9:16 pm
Sivarajah,
This depends on where your exhaust fan is pulling air from. If you get fresh air using and exhaust fan you do have ventilation for this space. The fire suppression systems is irrelevant to this credit in my opinion.