"Categorized as an Office Space"
CS-2009 EAc1:Optimize Energy Performanceposted by Aaron Frantz on
We are proposing a new mixed use multi-story to be submitted under NC, v2009. The first floor will be cold dark shell space for future retail/restaurant tenants.
IAQ calculator v03
NC-v4 EQp1:Minimum indoor air quality performanceposted by Izabela Kwiecinska on
The new calculator (v2009v4_Minimum IAQ Performance Calculator_v03) from the Resources tab, does not count the ‘Zone Outdoor Airflow’ (column N) and it shows 0,00 no matter what system and values w
Documentation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Saif Abdulameer on
Hello everyone, I am working on the documentation of a Multi zone project for the cooling conditions in this case should the "Zone Primary Air flow Vpz" be equal to the "Zone Discharge Airflow Vd
Commissioning of PV system by different commissioning agent
NC-2009 EAc2:On-Site Renewable Energyposted by Deborah Lucking on
We have had this question come up a few times - the owner and the PV system supplier believe that it can be commissioned by a different commissioning agent.
RE: Would we exclude interior walls that were never permitted?
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Diane Hale CHMM, CDGP, CEM, CESCO on
We have an existing older building that had interior walls and sectioned rooms put in that were never permitted and were not code compliant.
New O & M Starter Kit IN Credits
NC-2009 IDc1:Innovation in Designposted by Kristen Callori on
Hello- Now that these new O & M Starter Kit IN credits are available, and they require that (2) O&M Prerequisite Plans be implemented (such as Green Cleaning + Integrated Pest Management) i
Separate Changing and Shower Rooms
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Tee Howard on
I would like to clarify the LEED V2009 requirement for Showers and Changing Rooms.
Entryway Systems Location
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Tee Howard on
Context: The vestibule of our commercial building has entry/exit portals; but only leads users to an unenclosed (shell-like, meaning walls on two sides and two big openings to pass thru, and a trel
ROCKY SOIL
NC-v4 SSc2:Site development - protect or restore habitatposted by soha yamani on
in case of rocky soil , limestone precisely in desert area , what kind of restoration should be done ?
Add row to purchasing calculator
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Mihir Parikh on
I'm trying to add a data row to the calculator and it seems to be locked and requires a password. Is there any way to add in a row to the calculator?