Log in
Forum
Topic

Thermal comfort control for hotel lobby, bar, restaurant

Hospitality-NC-v4 EQc5: Thermal comfort
posted by Giuseppina Amorusi on Apr 8, 2022, 6:39 am

Good morning

I have a question relating thermal comfort in a hotel building.

The protocol require to have thermal comfort controls allow occupant whether in individual spaces or...

Last reply: Martina Dell'antonio, Jan 10, 2025, 11:28 am

Basic Services within Hotel Project

NC-2009 SSc2: Development Density and Community Connectivity
posted by Annalise Reichert on Jan 22, 2016, 5:08 pm

I am working on a Hotel that has a laundry facility on-site for guest use, and also offers valet dry-cleaning services and grocery shopping services for guests. Am I able to count any of these...

Last reply: Manish Srma, Jan 10, 2025, 6:16 am

Adhesive & Sealants: VOC Content 0 g/L VOC Emissions?

NC-v4.1 EQc2: Low-emitting materials
posted by Alyssa Scharf on Oct 3, 2024, 10:08 am

There is an adhesive that the manufacturer claims is 0 g/L of...

Last reply: Sharif yt, Jan 10, 2025, 1:57 am

LEED requirements for kitchens

NC-v4 EAp2: Minimum Energy Performance
posted by Gabriela Mesquita on Jan 9, 2025, 12:07 pm

What are the LEED certification requirements for an industrial kitchen/dining room?
Indications for typical equipment such as ovens, fryers, dishwashers and stoves. In the LEED credit...

Are Materials Installed in the Loading Bay Subject to the Low-Emitting Material Requirements?

NC-v4.1 EQc2: Low-emitting materials
posted by Kristina K on Jan 7, 2025, 4:51 pm

Hello,

Are materials used in loading bays required to be submitted under the low-emitting materials credit?

For our project, the loading bay is accessed through a garage door and is...

Last reply: Ralph Bicknese, Jan 8, 2025, 12:34 pm

Exterior Tradable Surfaces Allowed LPD in MEPC.

CS-2009 EAp2: Minimum Energy Performance
posted by Paula Hernandez on Jan 8, 2025, 7:50 am

Hello,

I am performing an energy modelling for a C&S building.
When filling in the exterior lighting data in the "Lighting" tab, Tradable Surfaces, it seems that the values ​​...

Regd. Fresh Air Qty for energy modelling

NC-v4 EAp2: Minimum Energy Performance
posted by Anurag Ghosh on Jan 8, 2025, 3:41 am

Hi,

We are performing energy modelling for an airport. We have the Heat Load Summary Sheet where the Minimum Outdoor Air Requirement is taken with 30% excess to ASHRAE 62.1...

Guidance on Green Wall Irrigation Requirements

Data-Centers-NC-v4 WEc1: Outdoor water use reduction
posted by Venkatkrishnan Ashok on Dec 10, 2024, 11:58 am

Hello,

We are proposing a green wall for our project, which will require irrigation and must adhere to the guidelines outlined in Option 2 of this credit. However, we were unable to locate...

Last reply: Quantity Takeoff, Jan 7, 2025, 12:43 am

chilled water and hot water metering for expansions of an existing building

NC-v4 EAc3: Advanced Energy Metering
posted by Moses Chong on Dec 11, 2024, 2:40 pm

I'm working on a project that is an expansion of an existing building, primarily adding a few levels on top. The cooling and heating energy of the expansion exceeds 10% of total energy use so...

Last reply: Texas Takeoff, Jan 7, 2025, 12:41 am

Baseline and Proposed Constructions for a building constructed in 1970 for ID+C Project

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Oct 8, 2024, 12:03 pm

Hi, 
 

I am working on a LEED ID+C V4project , we dont have existing construction details for the building and the building was constructed in 1970, What should i assume for building...

Last reply: Juni pererva, Jan 7, 2025, 12:35 am