Topic | Recent |
---|---|
Required documentation for WEc3 Option 1 Cooling Tower Cycles of ConcentrationNC-v4.1 WEc3: Optimize Process Water Useposted by Mark Benson on Jun 24, 2025, 8:53 am
For Option 1 Cooling Tower... |
|
Prevention Through DesignHealthcare-v4 INc1: Innovationposted by Katherine Zanecosky on Oct 17, 2018, 3:39 pm
Hi fellow LEED Users? Has anyone else attempted the Prevention Through Design credit? If so, Did you experience any issues with meeting requirements? What... Last reply: Michelle Cordero, Jun 24, 2025, 3:42 am |
|
Submitting Minimum Energy Performance Data for Multiple Buildings in LEED Campus Group ApproachCS-v4 EAp2: Minimum Energy Performanceposted by Alvaro Twose on Nov 12, 2024, 7:25 am
Hello LEED colleagues, I'm working on a Core & Shell project with multiple buildings under LEED Campus following the Group Approach. I've encountered a challenge when submitting the... Last reply: Marcus Sheffer, Jun 23, 2025, 4:17 pm |
|
Prevention through Design- BOD e OPRPilot-Credits IPpc93: Prevention through designposted by Adriana Hansen on Jun 10, 2021, 5:14 pm
Hello, We are trying to get credit on a project and would like to know if the items studied for credit need to be described in the... Last reply: Laura Castanon, Jun 19, 2025, 5:30 pm |
|
Painting HVAC Units on roofNC-v4 SSc5: Heat Island Reductionposted by Deborah Stadler on Jun 18, 2025, 4:46 pm
The client is close to getting the credit and wondered if painting the units on the roof would help. I think it does from a heat island effect, but not from a LEED Credit point of view. Is it... |
|
Exhaust rate Table 6.5 ASHRAE 62.1 Clarifications for toiletsNC-v4.1 EQp1: Minimum indoor air quality performanceposted by Alessandro Zuanon on Jun 17, 2025, 6:49 am
Dear all, some questions about exhaust flow rates to be used for toilets form table 6.5 of ASHRAE 62.1: -is it confirmed that L/s/unit for "toilets - public" means L/s per water... |
|
Indoor Water Use calculations for DaycareNC-v4 WEp2: Indoor water use reductionposted by Divya Shroff on Jun 13, 2025, 1:29 pm
Can infants and toddlers be excluded from indoor water use calculations for a daycare facility? Given that they will be using diapers rather than water closets or lavatories. |
|
selection between BD+C: CS or NCLEED Rating System Selectionposted by Kyu-min Lee on Jun 12, 2025, 11:30 pm
I am working on the Leed project for the elderly care facility (nursing home). The project consists of 3 underground floors and 11 above-ground floors, and the 2nd to 11th floors,... |
|
EQc Low Emitting Materials- butyl sealant that meets requirementsNC-v4 EQc2: Low-emitting materialsposted by Theresa Lehman on Oct 21, 2024, 5:07 pm
The subcontractor supplying the commercial kitchen equipment for a project included a sealant (Premier XtraBond 1500NS) in their submittal that is not compliant with the LEED EQc Low-Emitting... Last reply: Theresa Lehman, Jun 12, 2025, 4:00 pm |
|
Comprehensive composting in small building officePilot-Credits SSpc129: Comprehensive Compostingposted by Belén Valladares López on Jun 12, 2025, 7:02 am
We are pursuing this credit for a small office building under LEED Core & Shell. One of the requirements for the credit is to " Arrange outreach and education procedure for the... |