Urinals on residencialNC-2009 WEc3: Water Use Reductionposted by Alejandro Macias on Apr 12, 2016, 2:36 pm
I m working on a dormitory for kids. On the project we have bathrooms that only will be used by the kids (I am considering them as residencial), and other restrooms that will only be used for the... Last reply: Carlie Bullock-Jones, Aug 11, 2016, 2:10 pm |
|
Manufacturing processNC-v4 EAp2: Minimum Energy Performanceposted by ignacio furniés on Aug 5, 2016, 12:10 pm
My question is regarding the EAp2 and EAc3, our project consists of a palm oil manufacturing facility. The energy intensive manufacturing process exceeds an estimated 90% of the facility's total... Last reply: Marcus Sheffer, Aug 9, 2016, 9:56 am |
|
Demonstrate Savings for CRAC UnitsCI-2009 EAc1.3: Optimize energy performance - HVACposted by Gabriela Crespo on Aug 5, 2016, 1:04 pm
Dear all, Same project as before, Central Chilled Water System, not in our scope. The only HVAC equipment in our scope are 2 CRAC units for the office's SITES. If we want to demonstrate... Last reply: Marcus Sheffer, Aug 6, 2016, 2:33 pm |
|
Ask about light and views IndexNC-2009 IEQc8.1: Daylight and views - daylightposted by Jose Alfonso Vergara Vasquez on Jul 21, 2016, 11:12 pm
Hi , I wonder what happens when you have more windows than is required and the index exceeds the recommended? Last reply: TODD REED, Jul 22, 2016, 8:07 am |
|
SR Natural stoneNC-v4 SSc5: Heat Island Reductionposted by Juan Carlos Contreras on Jul 19, 2016, 2:59 pm
Hello, Last reply: Summer Minchew, Jul 19, 2016, 3:29 pm |
|
Daylight controlsCI-v4 EAp2: Minimum Energy Performanceposted by Gabriela Crespo on Jul 18, 2016, 1:28 pm
Dear all, We are working on a project to be certified CI v4. The use is a software development office, the building is 100% glazing in a very hot climate. The owner will be installing... Last reply: Gabriela Crespo, Jul 18, 2016, 2:46 pm |
|
Interpretation ProblemCI-2009 EAc1.3: Optimize energy performance - HVACposted by Maria Isabel Conde on Jul 8, 2016, 12:46 pm
We have a problem with the interpretation of the information necessary to apply for this credit. Credit requirement explain that I have to meet one of the following: Air handlers that... Last reply: Maria Isabel Conde, Jul 12, 2016, 2:45 pm |
|
Energy Metering for Multi-tenant buildingEBOM-v4 EAc5: Advanced Energy Meteringposted by Gabriela Crespo on Jul 7, 2016, 11:59 am
Dear all, We are working on a LEED EB project that wants to explore this credit, I understand the requirements are to monitor all energy sources, as the pre-requisite states, and... Last reply: Dave Hubka, Jul 7, 2016, 12:38 pm |
|
Equipment not list on CPGCI-2009 EAc1.3: Optimize energy performance - HVACposted by Maria Isabel Conde on Jul 1, 2016, 5:53 pm
Our project has a WSHP bigger than 135000 btu/h. According to CPG table 2.9.2 the efficiency required for WSHP up to 135000 btu/h is 14 EER and the WSHP of our project has a 14.1 EER. ... Last reply: Maria Isabel Conde, Jul 5, 2016, 12:23 pm |
|
LEED EAc2 for CampusNC-2009 EAc2: On-Site Renewable Energyposted by Mauricio Ramirez on Mar 15, 2016, 12:51 pm
Hello. I'm working on a Campus project that are designing a large PV installation in the roof and façade of the different building as they are built, but that will cover also areas outside of the... Last reply: Mauricio Ramirez, Jul 1, 2016, 3:44 pm |