Hello. I'm working on a Campus project that are designing a large PV installation in the roof and façade of the different building as they are built, but that will cover also areas outside of the buildings.
We are preparing to Pre-approve campus credits for master site infrastructure, and then certify the buildings taking advantage of the pre-approved credits. However during Campus review we will not have the individual buildings Energy Model, to define the individual design estimated consumption, to compare with the entire system of PV and define the percentage of renewables campus wide. We have a Master Site consumption estimation made by the energy designer, calculated with energy intensities, by FTE and/or constructed area. Do you think that this numbers may help us to pre-approve the credit, and then confirm the values during individual certification?